Province | Town/City | Barangay | Intervention | Details | Status |
---|---|---|---|---|---|
ESamar | Balangiga | Cag-olango | Rehabilitation of School Building | 1 unit: 1CL | Finished |
ESamar | Balangiga | Cag-olango | Provision of Basic Amenities and Equipment of 4 ES Buildings | 0% | |
ESamar | Balangiga | Cansumangkay | Rehabilitation of School Building | 1 unit: 3CL | Finished |
ESamar | Balangiga | Cansumangkay | Provision of Basic Amenities and Equipment of 4 ES Buildings | 0% | |
ESamar | Balangiga | San Miguel | Rehabilitation of School Building | 1 unit: 2CL & 1 faculty room | Finished |
ESamar | Balangiga | San Miguel | Provision of Basic Amenities and Equipment of 4 ES Buildings | 0% | |
ESamar | Balangiga | Sta. Rosa | Rehabilitation of School Building | 1 unit: 2CL | Finished |
ESamar | Balangiga | Sta. Rosa | Provision of Basic Amenities and Equipment of 4 ES Buildings | 0% | |
ESamar | Guiuan | Poblacion 8 | Reconstruction of RHU | 1 unit | 97% |
ESamar | Hernani | Batang | Reconstruction of Barangay Street Lights | 29 units | Finished |
ESamar | Hernani | Cacatmonan | Reconstruction of Barangay Street Lights | 25 units | Finished |
ESamar | Hernani | Canciledes | Rehabilitation and Improvement of 465 Lm Drainage Canal with Cover | 420 l.m. and 45 l.m. | Finished |
ESamar | Hernani | Carmen | Reconstruction of Barangay Street Lights | 48 units | Finished |
ESamar | Hernani | Nagaja | Rehabilitation of Relief Distribution and Activity Center | 1 unit | Finished |
ESamar | Hernani | Poblacion 1 | Reconstruction of Barangay Street Lights | 11 units | Finished |
ESamar | Hernani | Poblacion 2 | Reconstruction of Barangay Street Lights | 28 units | Finished |
ESamar | Hernani | Poblacion 3 | Reconstruction of Water System Level 1 (13 units Jetmatic Pumps) | 13 units | Finished |
ESamar | Hernani | San Isidro | Reconstruction of Barangay Street Lights | 39 units | Finished |
ESamar | Hernani | San Miguel | Reconstruction of 90 Lm Drainage Canal with Cover | 90 l.m. | Finished |
ESamar | Salcedo | Asgad | Rehabilitation of 62 units Barangay Street Lights | 62 units | Finished |
ESamar | Salcedo | Caridad | Rehabilitation of 0.2km Barangay Road | 0.2 km | Finished |
ESamar | Salcedo | Casilion | Rehabilitation of Pump Driven Level 2 Water System | 16 tapstand, 1,517 ln.m | 96% |
ESamar | Salcedo | Iberan | Rehabilitation of 0.646km Barangay Road | 0.646 km | Finished |
ESamar | Salcedo | Jagnaya | Rehabilitation of 66 units Barangay Street Lights | 66 units | Finished |
ESamar | Salcedo | Maliwaliw | Rehabilitation of 0.662km Barangay Road | .662 Km | Finished |
ESamar | Salcedo | Poblacion 12 | Rehabilitation of 354 Lm Drainage Canal | 354 Lm | Finished |
ESamar | Salcedo | Seguinon | Rehabilitation of 0.612km Barangay Road | .612 Km | Finished |
ESamar | Salcedo | Sta. Cruz | Rehabilitation of Pump Driven Level 2 Water System | 1 lot well dev., 9 tapstand, 677.50 ln.m | Finished |
ESamar | Salcedo | Tacla-on | Rehabilitation of Pump Driven Level 2 Water System | 12 tapstand, 1,962 ln.m | Finished |
ESamar | Salcedo | Tagbacan | Rehabilitation of 0.463km Barangay Road | .463 Km | Finished |
ESamar | Sulat | San Francisco | Rehabilitation of Farm to Market Road | 1 KM FMR | Finished |
Leyte | Javier | Abuyogay | Rehabilitation/Repair of Marcos Type School Building | 1unit Sch. Bldg. | Finished |
Leyte | Javier | Abuyogay | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Andres Bonifacio | Rehabilitation of Streetlights | 18 units | Finished |
Leyte | Javier | Batug | Rehabilitation of Streetlights | 16 units | Finished |
Leyte | Javier | Batug | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Calzada | Rehabilitation/Repair of Barangay Health Station | 1 unit Brgy. Health Center | Finished |
Leyte | Javier | Calzada | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Caranhug | Rehabilitation of Streetlights | 22 units | Finished |
Leyte | Javier | Caranhug | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Caraye | Rehabilitation of Streetlights | 15 units | Finished |
Leyte | Javier | Caraye | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Casulongan | Rehabilitation/Repair of Day Care Center | I unit day care | Finished |
Leyte | Javier | Casulongan | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Comatin | Rehabilitation of Streetlights | 35 units | Finished |
Leyte | Javier | Comatin | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Guindapunan | Rehabilitation/Repair of Level II Gravity Fed Water System | 913 lnm & 8 units tapstand | Finished |
Leyte | Javier | Guindapunan | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Inayupan | Rehabilitation of Streetlights | 25 units | Finished |
Leyte | Javier | Inayupan | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Laray | Rehabilitation of Streetlights | 25 units | Finished |
Leyte | Javier | Laray | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Magsaysay | Rehabilitation/Repair of 1CL ES Building | 1 CL Sch. Bldg. | Finished |
Leyte | Javier | Magsaysay | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Malitbogay | Rehabilitation/Repair of Level II Gravity Fed Water System | 1065 ln.m. | Finished |
Leyte | Javier | Malitbogay | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Manlilisid | Rehabilitation of Streetlights | 26 units | Finished |
Leyte | Javier | Manlilisid | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Naliwatan | Rehabilitation of Streetlights | 20 units | Finished |
Leyte | Javier | Naliwatan | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Odiong | Rehabilitation of Streetlights | 22 units | Finished |
Leyte | Javier | Odiong | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Picas Norte | Rehabilitation of Streetlights | 28 units | Finished |
Leyte | Javier | Picas Norte | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Poblacion Zone 1 | Rehabilitation of Streetlights | 24 units | Finished |
Leyte | Javier | Poblacion Zone 1 | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Sta. Cruz | Rehabilitation/Repair of Day Care Center | 1 unit Day Care Center | Finished |
Leyte | Javier | Sta. Cruz | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Javier | Talisayan | Rehabilitation/Repair of 1CL ES Building | 1 CL Sch. Bldg. | Finished |
Leyte | Javier | Talisayan | Provision of Basic Amenities and Equipment | 0% | |
Leyte | Kananga | Cacao | Reconstruction of 1 unit 2CL ES Building | 1 unit 2 CL School Bldg | 90.02% |
Leyte | Kananga | Kawayan | Reconstruction of 1 unit 2CL SS Building | 1 unit 2 CL School Bldg | 57.60% |
Leyte | Kananga | Montebello | Reconstruction of 1 unit 1CL ES Building | 1 unit 1 CL School Bldg | 43.80% |
Leyte | Kananga | Tugbong | Reconstruction of 1 unit 2CL ES Building | 1 unit 2 CL School Bldg | Finished |
Leyte | Leyte | Belen | Rehabilitation of Water System | 1 unit Intake Box, 2 units Reservoir and 7 Tapstand | 89.03% |
Leyte | Leyte | Elizabeth | Rehabilitation of Hanging Bridge | 78 Lm Bridge | 61.40% |
Leyte | Leyte | Palid II | Reconstruction of 1 unit 2CL | 2 Classrooms -126 sq.m | 58% |
Leyte | Mahaplag | Campin | Repair of Water System Level II | 1 system, 792 ln.m | Finished |
Leyte | Mahaplag | Campin | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Cuatro de Agosto | Rehabilitation of 24 units Street Light Post | 24 units, 1,400 ln.m | Finished |
Leyte | Mahaplag | Cuatro de Agosto | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Hiluctogan | Repair of Hanging Bridge II | Finished | |
Leyte | Mahaplag | Hiluctogan | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Hilusig | Rehabilitation of 16 units Street Light Post | 16 units, 1,320 ln.m. | Finished |
Leyte | Mahaplag | Hilusig | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Himamara | Repair of Water System Level II | 1,044 ln.m | Finished |
Leyte | Mahaplag | Himamara | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Hinaguimitan | Repair of Barangay Hall Building | 1 Unit Brangay Health Center | Finished |
Leyte | Mahaplag | Hinaguimitan | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Liberacion | Improvement of Water System Level II | 968 ln.m. | Finished |
Leyte | Mahaplag | Liberacion | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Mabuhay | Improvement of 1.20m diameter RCPC and 10m Pathwalk | 10 pcs RCPC, 10 ln.m | Finished |
Leyte | Mahaplag | Mabuhay | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Mabunga | Improvement of 49m River Flood Control Protection | 49 ln.m | Finished |
Leyte | Mahaplag | Mabunga | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Magsuganao | Repair of Water System Level II | 1,400 ln.m | Finished |
Leyte | Mahaplag | Magsuganao | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Mahayag | Repair of Barangay Health Center | 1 Unit Brangay Health Center | Finished |
Leyte | Mahaplag | Mahayag | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Mahayahay | Rehabilitation of 0.085km FTMR | 0.080 km. | Finished |
Leyte | Mahaplag | Mahayahay | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Maligaya | Repair of Day Care Center | 20 sq.m | Finished |
Leyte | Mahaplag | Maligaya | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Malinao | Repair of Water System Level II | 1 system, 1,374 ln.m. | Finished |
Leyte | Mahaplag | Malinao | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Malipoon | Repair of Palanogan Spillway Road Going to Malipoon | 17.4 sq.m. | Finished |
Leyte | Mahaplag | Palanogan | Repair of 0.122km PCCP FTMR | 0.122 km | Finished |
Leyte | Mahaplag | Palanogan | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Paril | Repair of School Building | 49.0 sq.m | Finished |
Leyte | Mahaplag | Paril | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Pinamono-an | Rehabilitation of 0.091km FTMR | 0.088 km | Finished |
Leyte | Mahaplag | Poblacion | Repair of School Building | 57.6 sq.m. | Finished |
Leyte | Mahaplag | Poblacion | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Polahongon | Repair of Water System Level II | 1 system, 680 ln.m | Finished |
Leyte | Mahaplag | Polahongon | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | San Isidro | Rehabilitation of 0.084km FTMR | 0.084 km. | Finished |
Leyte | Mahaplag | San Juan | Rehabilitation of 0.150km FTMR | 0.150 km | Finished |
Leyte | Mahaplag | Sta. Cruz | Rehabilitation of 0.094km FTMR | 0.090 km. | Finished |
Leyte | Mahaplag | Sto. Niño | Repair of Barangay Hall Building | 35.0 sq.m | Finished |
Leyte | Mahaplag | Sto. Niño | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Tagaytay | Repair of Barangay Hall Bldg | 1 Unit Brangay Hall | Finished |
Leyte | Mahaplag | Tagaytay | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Uguis | Repair of Water System Level II | 500 ln.m | Finished |
Leyte | Mahaplag | Uguis | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Union | Repair of Barangay Hall Building | 1 Unit Brangay Hall | Finished |
Leyte | Mahaplag | Union | Provision of Basic Amenities and Equipment | Finished | |
Leyte | Mahaplag | Upper | Rehabilitation of 27 units Street Light Post | 27 units, 1,520 ln.m | Finished |
Leyte | Mayorga | Gen. A. Luna | Rehabilitation/Improvement of Streetlights | 22 units | Finished |
Leyte | Mayorga | Liberty | Rehabilitation/Improvement of Streetlights | 24 units | Finished |
Leyte | Mayorga | Poblacion Zone III | Rehabilitation/Improvement of Streetlights | 30 units | Finished |
Leyte | Mayorga | Union | Rehabilitation/Improvement of Streetlights | 23 units | Finished |
Leyte | Tanauan | Arado | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Bangon | Construction of Gravity Fed Water System Level 2 | Tramission pipes | 0% |
Leyte | Tanauan | Bangon | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Bangon | Rehabilitation of Streetlights | *see San Victor | Finished |
Leyte | Tanauan | Bantagan | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Bislig | Reconstruction of School Building | 1 unit: 2CL, 1 unit: 1CL | Finished |
Leyte | Tanauan | Buntay | Rehabilitation of Streetlights | *see San Roque | Finished |
Leyte | Tanauan | Cabarasan Guti | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Cabuynan | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Cahumayhumayan | Rehabilitation of Streetlights | *see Pago | Finished |
Leyte | Tanauan | Calsadahay | Construction of Gravity Fed Water System Level 2 | Tramission pipes | 0% |
Leyte | Tanauan | Calsadahay | Rehabilitation of Streetlights | *see San Victor | Finished |
Leyte | Tanauan | Canramos | Rehabilitation of Streetlights | *see San Roque | Finished |
Leyte | Tanauan | Catmon | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Guindag-an | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Guingauan | Rehabilitation of Streetlights | *see Pago | Finished |
Leyte | Tanauan | Hilagpad | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Kiling | Rehabilitation of Streetlights | *see Pago | Finished |
Leyte | Tanauan | Lapay | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Likod | Rehabilitation of Streetlights | *see San Roque | Finished |
Leyte | Tanauan | Limbuhan Dacu | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Limbuhan Guti | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Maghulod | Rehabilitation of Streetlights | 256 - 17 barangays | Finished |
Leyte | Tanauan | Malaguicay | Rehabilitation of Streetlights | *see Pago | Finished |
Leyte | Tanauan | Maribi | Rehabilitation of Streetlights | *see Pago | Finished |
Leyte | Tanauan | Pago | Rehabilitation of Streetlights | 95 units - 7 barangays | Finished |
Leyte | Tanauan | Sacme | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Salvador | Construction of Gravity Fed Water System Level 2 | Tramission pipes | 0% |
Leyte | Tanauan | Salvador | Rehabilitation of Streetlights | *see Pago | Finished |
Leyte | Tanauan | San Isidro | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | San Miguel | Rehabilitation of Streetlights | *see San Roque | Finished |
Leyte | Tanauan | San Roque | Rehabilitation of Streetlights | 135 units - 5 barangays | Finished |
Leyte | Tanauan | San Victor | Rehabilitation of Streetlights | 127 units - 3 barangays | Finished |
Leyte | Tanauan | Sta. Elena | Rehabilitation of Streetlights | *see Maghulod | Finished |
Leyte | Tanauan | Talalora | Rehabilitation of Streetlights | *see Maghulod | Finished |
WSamar | Basey | Amandayehan | Rehabilitation of Gravity Fed Water Sytem Level II | 90% | |
WSamar | Basey | Balud | Reconstruction of Day Care Center | 1 Unit Day Care Center | Finished |
WSamar | Basey | Baybay | Repair/Rehabilitation of Drainage Canal | Finished | |
WSamar | Basey | Binongtu-an | Improvement of Drainage Canal | Finished | |
WSamar | Basey | Cambayan | Repair/Rehabilitation of Concrete Box Culvert and Riprapping of Creek Embankment | Finished | |
WSamar | Basey | Cogon | Rehabilitation of School Building (3CL) | 3 Class Rooms | 95.80% |
WSamar | Basey | Dolongan | Rehabilitation of Gravity Fed Water Sytem Level II | 1 Unit Day Care Center | Finished |
WSamar | Basey | Guirang | Rehabilitation of Gravity Fed Water Sytem Level II | 39.80% | |
WSamar | Basey | Mabini | Rehabilitation of Concrete Pathwalk | Finished | |
WSamar | Basey | Magallanes | Improvement of Concrete Pathwalk | Finished | |
WSamar | Basey | Pelit | Improvement of Concrete Pathwalk | Finished | |
WSamar | Basey | Roxas | Rehabilitation of Barangay Hall | 1 Unit Brangay Hall | 90.60% |
WSamar | Basey | Sugca | Improvement of Conrete Pathwalk | Finished | |
WSamar | Basey | Villa Aurora | Improvement of Concrete Pathwalk | Finished | |
WSamar | Marabut | Amambucale | Improvement of Level 1 Water System | Finished | |
WSamar | Marabut | Amantillo | Improvement of Street Lights | 8 Units | Finished |
WSamar | Marabut | Legaspi | Improvement of Street Lights | 9 Units | Finished |
WSamar | Marabut | Lipata | Rehabilitation of Barangay Road | 0.0536 km | Finished |
WSamar | Marabut | Malobago | Improvement of Level 2 Water System | 5 tapstands | 92% |
WSamar | Marabut | Odoc | Improvement of 15 Lm Seawall | 15 linear meters | Finished |
WSamar | Marabut | Osmena | Improvement of Level 2 Water System | Finished | |
WSamar | Marabut | Panan-awan | Improvement of Level 2 Water System | *see Osmena | Finished |
WSamar | Marabut | Pinamitinan | Improvement of Level 2 Water System | 8 tapstands | 97.90% |
WSamar | Marabut | Roño | Improvement of Street Lights | 8 Units | Finished |
WSamar | Marabut | San Roque | Improvement of Concrete Pathwalk | 0.416 km | Finished |
WSamar | Marabut | Sto. Niño | Improvement of Drainage Canal | 114.40 linear meters | Finished |
WSamar | Marabut | Tinabanan | Improvement of Farm to Market Road | 0.27 km | Finished |
ESamar | Balangiga | Cag-olango | Construction of 4 New Classrooms | Cag-olango Elementary School | Finished |
---|---|---|---|---|---|
ESamar | Balangiga | Cansumangkay | Construction of 1 New Classroom | Cansumangkay Elementary School | Finished |
ESamar | Balangiga | San Miguel | Construction of 2 New Classrooms | San Miguel Elementary School | Finished |
ESamar | Balangiga | Sta. Rosa | Construction of 2 New Classrooms | Sta. Rosa Elementary School | Finished |
ESamar | Balangkayan | Balogo | Construction of 2 New Classrooms | Balogo Elementary School | Finished |
ESamar | Balangkayan | Cabay | Repair of 2 Classrooms | Cabay Elementary School | Finished |
ESamar | Balangkayan | Guinpoliran | Repair of 3 Classrooms | Guinpoliran Elementary School | Finished |
ESamar | Guiuan | Cogon | Construction of 11 New Classrooms | Guiuan National High School | Finished |
ESamar | Guiuan | Inapulangan | Construction of 1 New Classroom | Inapulangan Elementary School | |
ESamar | Guiuan | Suluan | Construction of 6 New Classrooms | Suluan Integrated School | |
ESamar | Hernani | Garawon | Repair of 2 Classrooms | Garawon Elementary School | Finished |
ESamar | Hernani | San Isidro | Construction of 1 New Classroom | San Isidro Elementary School | Finished |
ESamar | Quinapondan | Barangay 3 | Construction of 2 New Classrooms and Repair of 6 Classrooms | Quinapondan Central School | Finished |
ESamar | Salcedo | Barangay 9 | Relocation of entire school to higher grounds | Salcedo National High School | |
Leyte | Burauen | Buri | Repair of 2 Classrooms | Buri Elementary School | Finished |
Leyte | Burauen | Calsadahay | Construction of 1 New Classroom | Calsadahay Elementary School | Finished |
Leyte | Burauen | Hapunan | Construction of 1 New Classroom & Repair of 1 Classroom | Hapunan Elementary School | Finished |
Leyte | Burauen | Patong | Construction of 2 New Classrooms | Patong Elementary School | Finished |
Leyte | Burauen | San Pablo | Construction of 4 New Classrooms | San Pablo Elementary School | Finished |
Leyte | Burauen | Villa Aurora | Construction of 3 New Classrooms & Repair of 1 Classroom | Villa Aurora Elementary School | Finished |
Leyte | Dulag | Salvacion | Construction of 4 New Classrooms | Salvacion Elementary School | Finished |
Leyte | Kananga | Aguiting | Repair of 4 Classrooms | Aguiting Elementary School | Finished |
Leyte | Kananga | Cacao | Construction of 3 New Classrooms | Cacao Elementary School | Finished |
Leyte | Kananga | Montebello | Repair of 5 Classrooms | Kananga National High School | Finished |
Leyte | Kananga | Tagaytay | Construction of 1 New Classroom & Repair of 2 Classrooms | Tagaytay Elementary School | Finished |
Leyte | Kananga | Tugbong | Construction of 2 New Classrooms | Tugbong Elementary School | Finished |
Leyte | Mayorga | Pob. Zone 3 | Construction of 3 New Classrooms | Mayorga Central Elementary School | Finished |
Leyte | Tanauan | Bislig | Repair of 8 Classrooms | Bislig Elementary School | Finished |
WSamar | Basey | Bacubac | Construction of 2 New Classrooms | Bacubac Elementary School | Finished |
WSamar | Basey | Catadman | Relocation of entire school (2 Buildings, 5 Classrooms) | Catadman Elementary School | Finished |
WSamar | Basey | Old San Agustin | Construction of 4 New Classrooms | Old San Agustin Elementary School | Finished |
Province | Town/City | Barangay | Intervention | Details | Status |
---|---|---|---|---|---|
ESamar | Balangkayan | Balogo | Cash For Work (CFW) Program | Concreting of School Pathways (44 sq.m) | Finished |
ESamar | Balangkayan | Balogo | Cash For Work (CFW) Program | Concreting of Barangay Road | Finished |
ESamar | Balangkayan | Balogo | Cash For Work (CFW) Program | Backyard hole land filling and levelling | Finished |
ESamar | Balangkayan | Balogo | Cash For Work (CFW) Program | Rehab/widening of Barangay Drainage | Finished |
ESamar | Balangkayan | Balogo | Cash For Work (CFW) Program | Re graveling of Brgy Road (aggregate base course) | Finished |
ESamar | Balangkayan | Balogo | Cash For Work (CFW) Program | Repair / Rehab of Makeshift Classroom | Finished |
ESamar | Balangkayan | Balogo | Cash For Work (CFW) Program | Window Grills Installation (Wooden Type) | Finished |
ESamar | Balangkayan | Balogo | Cash For Work (CFW) Program | Compost Pit Making | Finished |
ESamar | Balangkayan | Balogo | Cash For Work (CFW) Program | School Perimeter Wooden Pole Fencing | Finished |
ESamar | Balangkayan | Balogo | Cash For Work (CFW) Program | School Drainage | Finished |
ESamar | Balangkayan | Balogo | Cash For Work (CFW) Program | Repainting of School Classrooms | Finished |
ESamar | Balangkayan | Cabay | Cash For Work (CFW) Program | Grouted Riprap (Salak River) | Finished |
ESamar | Balangkayan | Cabay | Cash For Work (CFW) Program | Grouted Riprap & patching of Coastal Pathway | Finished |
ESamar | Balangkayan | Cabay | Cash For Work (CFW) Program | Repair/ Rehab of Cultural Stage | Finished |
ESamar | Balangkayan | Cabay | Cash For Work (CFW) Program | Old Plaza Perimeter Fence | Finished |
ESamar | Balangkayan | Cabay | Cash For Work (CFW) Program | Brgy Drainage Excavation | Finished |
ESamar | Balangkayan | Cabay | Cash For Work (CFW) Program | Tree Planting (Fruit Tree and Malobago Tree) | Finished |
ESamar | Balangkayan | Cabay | Cash For Work (CFW) Program | Seedling Briquette Production | Finished |
ESamar | Balangkayan | Guinpoliran | Cash For Work (CFW) Program | Rehab / Upgrading of Pathway to Water Source | Finished |
ESamar | Balangkayan | Guinpoliran | Cash For Work (CFW) Program | Surfacing of Brgy Road | Finished |
ESamar | Balangkayan | Guinpoliran | Cash For Work (CFW) Program | Earth Canal Excavation | Finished |
ESamar | Balangiga | Cansumangkay | Cash For Work (CFW) Program | Excavation of Drainage Canal | Finished |
ESamar | Balangiga | Cansumangkay | Cash For Work (CFW) Program | Decloging of Existing Drainage Canal | Finished |
ESamar | Balangiga | Cansumangkay | Cash For Work (CFW) Program | Communal Garden | Finished |
ESamar | Balangiga | Cag-olango | Cash For Work (CFW) Program | Construction of School Perimeter Fence (200m) | Finished |
ESamar | Balangiga | Cag-olango | Cash For Work (CFW) Program | Demolition of School Building | Finished |
ESamar | Balangiga | Cag-olango | Cash For Work (CFW) Program | Rehabilitation of Water System | Finished |
ESamar | Balangiga | Cag-olango | Cash For Work (CFW) Program | Construction of Vermi House | Finished |
ESamar | Balangiga | Cag-olango | Cash For Work (CFW) Program | Tree Planting | Finished |
ESamar | Balangiga | Cag-olango | Cash For Work (CFW) Program | Establishment of Vegetable Gardening (10x20) | Finished |
ESamar | Balangiga | San Miguel | Cash For Work (CFW) Program | Construction of Perimeter Fence, San Miguel Elem School | Finished |
ESamar | Balangiga | San Miguel | Cash For Work (CFW) Program | Fabrication of Drainage canal concrete cover, San Miguel Elem School | Finished |
ESamar | Balangiga | San Miguel | Cash For Work (CFW) Program | Construction of Compost Pit, San Miguel Elem School | Finished |
ESamar | Balangiga | San Miguel | Cash For Work (CFW) Program | Construction of Tree Guard, Farm to Market Road | Finished |
ESamar | Balangiga | San Miguel | Cash For Work (CFW) Program | Tree Planting, Farm to Market Road | Finished |
ESamar | Balangiga | San Miguel | Cash For Work (CFW) Program | Declogging of Drainage Canal, Purok 2 | Finished |
ESamar | Balangiga | San Miguel | Cash For Work (CFW) Program | Establishment of Demo Farm | Finished |
ESamar | Balangiga | San Miguel | Cash For Work (CFW) Program | Vegetable Gardening | Finished |
ESamar | Balangiga | San Miguel | Cash For Work (CFW) Program | Corn Plantation | Finished |
ESamar | Balangiga | San Miguel | Cash For Work (CFW) Program | Seedling Briquette Production | Finished |
ESamar | Balangiga | San Miguel | Cash For Work (CFW) Program | Establishment of Mangrove Nursery | Finished |
ESamar | Balangiga | Sta. Rosa | Cash For Work (CFW) Program | Construction of School Perimeter fence | Finished |
ESamar | Balangiga | Sta. Rosa | Cash For Work (CFW) Program | Compost pit | Finished |
ESamar | Balangiga | Sta. Rosa | Cash For Work (CFW) Program | Declogging of Canal | Finished |
ESamar | Balangiga | Sta. Rosa | Cash For Work (CFW) Program | Tree planting | Finished |
ESamar | Balangiga | Sta. Rosa | Cash For Work (CFW) Program | Regravelling of brgy roads | Finished |
ESamar | Balangiga | Sta. Rosa | Cash For Work (CFW) Program | Rehabilitation of street lights | Finished |
ESamar | Balangiga | Sta. Rosa | Cash For Work (CFW) Program | Construction of Vermi house | Finished |
ESamar | Balangiga | Sta. Rosa | Cash For Work (CFW) Program | Seedling Briquette Production | Finished |
ESamar | Guiuan | Cogon | Cash For Work (CFW) Program | Construction of Earth Canal | Finished |
ESamar | Guiuan | Cogon | Cash For Work (CFW) Program | Construction of Compost Pit | Finished |
ESamar | Guiuan | Cogon | Cash For Work (CFW) Program | Construction of Material Recovery of Facilities (MRF) | Finished |
ESamar | Guiuan | Cogon | Cash For Work (CFW) Program | Gardening for Malnourish Children (community) | Finished |
ESamar | Guiuan | Cogon | Cash For Work (CFW) Program | School Gardening, Guiuan National High School | Finished |
ESamar | Guiuan | Cogon | Cash For Work (CFW) Program | Concreting of Road | Finished |
ESamar | Guiuan | Cogon | Cash For Work (CFW) Program | Construction of Roof shed for Water Pump | Finished |
ESamar | Guiuan | Cogon | Cash For Work (CFW) Program | Fixing of DCC Windows | Finished |
ESamar | Guiuan | Cogon | Cash For Work (CFW) Program | Installation of Street light Pole | Finished |
ESamar | Guiuan | Cogon | Cash For Work (CFW) Program | Demolition of Classroom , Guiuan National High School | Finished |
ESamar | Guiuan | Inapulangan | Cash For Work (CFW) Program | Underwater clean up | Finished |
ESamar | Guiuan | Inapulangan | Cash For Work (CFW) Program | Fabrication of Artificial coral reef | Finished |
ESamar | Guiuan | Inapulangan | Cash For Work (CFW) Program | Dam Construction: Clearing of River Ways | Finished |
ESamar | Guiuan | Inapulangan | Cash For Work (CFW) Program | Dam Construction: Filling of Gravel | Finished |
ESamar | Guiuan | Inapulangan | Cash For Work (CFW) Program | Construction of Bridge (Forms installation) | Finished |
ESamar | Guiuan | Inapulangan | Cash For Work (CFW) Program | Installation of Flaglets and bouys | Finished |
ESamar | Guiuan | Inapulangan | Cash For Work (CFW) Program | Development of Rice Farm | Finished |
ESamar | Guiuan | Inapulangan | Cash For Work (CFW) Program | Demolition of 2 classrooms (size: 7x9) | Finished |
ESamar | Guiuan | Inapulangan | Cash For Work (CFW) Program | Rehabilitation of 300 meters irrigation canal | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Burying of Water Pipe Line (from source to poblacion) | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Retrieving of erected wooden post at Sea | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Demolition/ Dismantling of Destroyed Houses (House of donato Abulencia), All Puroks | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Dismantling of Destroyed Houses ( 8units) | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Demolition of School Building, Suluan Intergrated School | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Clearing of access to Caves # II | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Clearing of Deepwell | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Tile setting fixtures, Day Care Center(DCC) painting | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Drainage canal | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Compost pit with fence | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Clearing & Garbage Disposal | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Concrete wall (school fencing) | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Fencing Rear side | Finished |
ESamar | Guiuan | Suluan | Cash For Work (CFW) Program | Removal of Tree | Finished |
ESamar | Hernani | Garawon | Cash For Work (CFW) Program | Demolition of Bunkhouse | Finished |
ESamar | Hernani | Garawon | Cash For Work (CFW) Program | Potting (Multi- nursery) | Finished |
ESamar | Hernani | Garawon | Cash For Work (CFW) Program | Excavation of Deepwell at Multi Purpose Nursery | Finished |
ESamar | Hernani | Garawon | Cash For Work (CFW) Program | Compost Pit Making | Finished |
ESamar | Hernani | Garawon | Cash For Work (CFW) Program | Construction of Cottage | Finished |
ESamar | Hernani | Garawon | Cash For Work (CFW) Program | School Perimeter Wooden Pole Fencing | Finished |
ESamar | Hernani | Garawon | Cash For Work (CFW) Program | Excavation of Irrigation Canal, Sitio Manglos | Finished |
ESamar | Hernani | Garawon | Cash For Work (CFW) Program | Excavation of Earth Canal | Finished |
ESamar | Hernani | Garawon | Cash For Work (CFW) Program | Rehabilitation of Child-Friendly Evacuation Route | Finished |
ESamar | Hernani | San Isidro | Cash For Work (CFW) Program | Rehabilitation of Water System ( Pipe Line) | Finished |
ESamar | Hernani | San Isidro | Cash For Work (CFW) Program | Repair of 3 units Foot Bridge | Finished |
ESamar | Hernani | San Isidro | Cash For Work (CFW) Program | Excavation of Drainage Canal/ Compost Pit | Finished |
ESamar | Hernani | San Isidro | Cash For Work (CFW) Program | Construction of School Perimater Fence | Finished |
ESamar | Salcedo | Barangay 9 | Cash For Work (CFW) Program | Mangrove Nursery Establishment | Finished |
ESamar | Quinapondan | Barangay 3 | Cash For Work (CFW) Program | Forest Tree Planting | Finished |
WSamar | Basey | Bacubac | Cash For Work (CFW) Program | Bridge & Canal Cleaning (2-Units) | Finished |
WSamar | Basey | Bacubac | Cash For Work (CFW) Program | Shoreline Clearing & Restoration | Finished |
WSamar | Basey | Bacubac | Cash For Work (CFW) Program | Painting of Daycare Center | Finished |
WSamar | Basey | Bacubac | Cash For Work (CFW) Program | Repair of Roofing & Sidings of Make-shift Classroom; Area= 10x7 (1-Unit) | Finished |
WSamar | Basey | Bacubac | Cash For Work (CFW) Program | Cutting of Coconut Trees (affected by school construction) | Finished |
WSamar | Basey | Bacubac | Cash For Work (CFW) Program | Canal Rehabilitation (Along Brgy. Rd. L=400m, & Along Zone 5 L=80m; Assumption: W=0.5m, D=0.6m) | Finished |
WSamar | Basey | Bacubac | Cash For Work (CFW) Program | Painting Works ( Existing Roofing of 4-Classrooms & Junior Fence 120 Lm | Finished |
WSamar | Basey | Bacubac | Cash For Work (CFW) Program | Making of Junior Fence (Concrete) 10m | Finished |
WSamar | Basey | Bacubac | Cash For Work (CFW) Program | Excavation of Drainage Canal (L=200, W=0.4m, D=0.35m) | Finished |
WSamar | Basey | Catadman | Cash For Work (CFW) Program | Rehabilitation of Earth Canal @ Roadside (L=700m, W=0.6, D=0.6) | Finished |
WSamar | Basey | Catadman | Cash For Work (CFW) Program | Construction of Demo House (4x10m) | Finished |
WSamar | Basey | Catadman | Cash For Work (CFW) Program | Establishment of Earth Canal (L=150m, W=0.6, D=0.6)in school | Finished |
WSamar | Basey | Catadman | Cash For Work (CFW) Program | Access Road | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Canal Rehabilitation (Canal 1 = 200m, Canal 2 = 200m) | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Cleaning of Public Wells (8 Wells) | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Construction of Perimeter Fence | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Painting Works(8 classrooms) | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Earth Canal (300m) | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Establishment of Compost Pit (5m x 5m x 5') | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Land Preparation | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Rehabilitation of Perimeter Fence @ Manila-ay (15m) | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Cleaning of School Wells (1 Well) | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | School Nursery | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Demolition of Wooden Make-shift Building | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Establishment of compost pit | Finished |
WSamar | Basey | Old San Agustin | Cash For Work (CFW) Program | Canal Rehabilitation | Finished |
Leyte | Burauen | Buri | Cash For Work (CFW) Program | Communal Gardening (1.6 hectare) | Finished |
Leyte | Burauen | Buri | Cash For Work (CFW) Program | Demo Farm (0.5 hectare) | Finished |
Leyte | Burauen | Buri | Cash For Work (CFW) Program | Establishment of Children's Play Ground | Finished |
Leyte | Burauen | Calsadahay | Cash For Work (CFW) Program | Pathway (L=150+300m, W=1.0m, Thk=0.35m) | Finished |
Leyte | Burauen | Calsadahay | Cash For Work (CFW) Program | Establishment of Compost pit (7 zones @2 units) | Finished |
Leyte | Burauen | Patong | Cash For Work (CFW) Program | Excavation of Earth Canal (L=270m, W=0.6m, D=1.0m) | Finished |
Leyte | Burauen | Patong | Cash For Work (CFW) Program | Establishment of Compost Pit (3.0mWx4.0mLx1.8mD - 4 units) | Finished |
Leyte | Burauen | Patong | Cash For Work (CFW) Program | Repair of School Fence (Light Materials only) - 400m | Finished |
Leyte | Burauen | Patong | Cash For Work (CFW) Program | Repair of Recovery Room (13x10m), Light Materials only | Finished |
Leyte | Burauen | Patong | Cash For Work (CFW) Program | Repair Social Hall in School (4x5m) | Finished |
Leyte | Burauen | Hapunan | Cash For Work (CFW) Program | Construction of Drainage Canal & Road Patching | Finished |
Leyte | Burauen | San Pablo | Cash For Work (CFW) Program | Brgy. Road Rehabilitation (patching) L=250m | Finished |
Leyte | Burauen | San Pablo | Cash For Work (CFW) Program | Earth Canal (L=300m, W=0.5m, D=0.6m ) | Finished |
Leyte | Burauen | San Pablo | Cash For Work (CFW) Program | Establishment of compost pit per purok (7 units) | Finished |
Leyte | Burauen | Villa Aurora | Cash For Work (CFW) Program | Fencing (Light Materials Only) 150LM | Finished |
Leyte | Burauen | Villa Aurora | Cash For Work (CFW) Program | Fencing for GUAT Production (Light Materials Only) 450LM | Finished |
Leyte | Burauen | Villa Aurora | Cash For Work (CFW) Program | Construction of Warehouse (Light Materials) 5 x 4m | Finished |
Leyte | Burauen | Villa Aurora | Cash For Work (CFW) Program | Establishment of Nursery House (in School) | Finished |
Leyte | Burauen | Villa Aurora | Cash For Work (CFW) Program | Establishment of Community Nursery House | Finished |
Leyte | Burauen | Villa Aurora | Cash For Work (CFW) Program | Construction of Multi- Purpose Cottage (Light Materials) 3x 3m | Finished |
Leyte | Burauen | Villa Aurora | Cash For Work (CFW) Program | Land Development (Landscaping/ Levelling) for Crops Dryer | Finished |
Leyte | Burauen | Villa Aurora | Cash For Work (CFW) Program | Water Pipeline Repair & Rehabilitation | Finished |
Leyte | Burauen | Villa Aurora | Cash For Work (CFW) Program | Fencing (Light Materials Only) 750LM (School) | Finished |
Leyte | Dulag | Salvacion | Cash For Work (CFW) Program | Rehabilitation of Multi-purpose hall fence | Finished |
Leyte | Dulag | Salvacion | Cash For Work (CFW) Program | Replacement of Tarpaulin Roofing of the H.E. Room | Finished |
Leyte | Dulag | Salvacion | Cash For Work (CFW) Program | Repair of barangay outpost | Finished |
Leyte | Dulag | Salvacion | Cash For Work (CFW) Program | Repair for the concrete bench (bleacher) of the multi-purpose hall | Finished |
Leyte | Dulag | Salvacion | Cash For Work (CFW) Program | Removal & Replacement of Cyclone Fencing of the School Perimeter | Finished |
Leyte | Dulag | Salvacion | Cash For Work (CFW) Program | Rehabilitation of School Garden | Finished |
Leyte | Dulag | Salvacion | Cash For Work (CFW) Program | Establishment of compost pit per purok (5puroks) | Finished |
Leyte | Dulag | Salvacion | Cash For Work (CFW) Program | Communal garden per purok (5 puroks) | Finished |
Leyte | Dulag | Salvacion | Cash For Work (CFW) Program | Root crop nursery | Finished |
Leyte | Dulag | Salvacion | Cash For Work (CFW) Program | Establishment of Compost Pit in School | Finished |
Leyte | Dulag | Salvacion | Cash For Work (CFW) Program | Earth canal | Finished |
Leyte | Kananga | Aguiting | Cash For Work (CFW) Program | Repair/Rehabilitation of Stage | Finished |
Leyte | Kananga | Aguiting | Cash For Work (CFW) Program | (Solid Waste Management) Repair of Existing MRF & Establishment of Compost Pit | Finished |
Leyte | Kananga | Aguiting | Cash For Work (CFW) Program | Repair of Temporary Fence @ Rear Portion of the School Campus (Used G.I. Sheets w/ Wooden Post) | Finished |
Leyte | Kananga | Aguiting | Cash For Work (CFW) Program | Rehabilitation of drain & Link Road | Finished |
Leyte | Kananga | Aguiting | Cash For Work (CFW) Program | Rehabilitation of Water Pipeline 1000m and Cleaning/Clearing of 1 unit Water Concrete Tank | Finished |
Leyte | Kananga | Aguiting | Cash For Work (CFW) Program | Construction of Piggery House for ACA Project; Assumption: for 10 pigs Capacity | Finished |
Leyte | Kananga | Aguiting | Cash For Work (CFW) Program | Construction of Vermi Bin and Housing (1 Unit) Assumption: 4x4m | Finished |
Leyte | Kananga | Aguiting | Cash For Work (CFW) Program | Repair & Rehabilitation of Tanod Outpost | Finished |
Leyte | Kananga | Aguiting | Cash For Work (CFW) Program | Construction of Daycare Center (7x8m) | Finished |
Leyte | Kananga | Aguiting | Cash For Work (CFW) Program | Rep-rap of Pathway at Sitio Balimbing (30m) | Finished |
Leyte | Kananga | Aguiting | Cash For Work (CFW) Program | Construction of ACA Recovery Room & Meeting Hall | Finished |
Leyte | Kananga | Cacao | Cash For Work (CFW) Program | Water Pipeline Repair/Rehabilitation (L= 200+100+200m) | Finished |
Leyte | Kananga | Cacao | Cash For Work (CFW) Program | Drainage Canal Rehabilitation (Purok Manga L=100m, Purok Tambis-Santol-Caimito L=200m) | Finished |
Leyte | Kananga | Cacao | Cash For Work (CFW) Program | Communal Garden | Finished |
Leyte | Kananga | Cacao | Cash For Work (CFW) Program | Repair/Rehabilitation of Perimeter Fence (Cyclone Fence) | Finished |
Leyte | Kananga | Cacao | Cash For Work (CFW) Program | Dredging of Canal | Finished |
Leyte | Kananga | Cacao | Cash For Work (CFW) Program | Tree Planting in Community & in School | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Construction of footstep @Zone Pluto | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Drainage Canal Rehabilitation (L=1120m, W=0.5m) | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Tree Planting | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | School Gardening & Beautification | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Demolition of Public CR | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Demolition of Nursery @ School and School Perimeter Fencing | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Repair of Material Recovery Facility (10'x14') | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Repair & Repainting of School Perimeter Fence (50m) | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Repair & Repainting of Plant Boxes (at School) | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | School Gardening | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Tampering of School Ground | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Repair & Repainting of School Furniture | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Establishment of Warehouse for Farmer Common Service Facilities (5x9m) | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Demolition of Abandoned School CR and Rehabilitationof school Water Pipeline | Finished |
Leyte | Kananga | Montebello | Cash For Work (CFW) Program | Road Patching and Compaction 200m (From Sitio Jupiter to Highway) | Finished |
Leyte | Kananga | Tagaytay | Cash For Work (CFW) Program | Water Pipeline Repair/Rehabilitation (L= 3000m) | Finished |
Leyte | Kananga | Tagaytay | Cash For Work (CFW) Program | Construction of Perimeter Fence (400LM)in School | Finished |
Leyte | Kananga | Tagaytay | Cash For Work (CFW) Program | Construction of Jetmatic Pump (1-set) | Finished |
Leyte | Kananga | Tagaytay | Cash For Work (CFW) Program | Excavation of 5 School Compost Pit | Finished |
Leyte | Kananga | Tagaytay | Cash For Work (CFW) Program | Beautification & Excavation of Temporary Drainage Canal | Finished |
Leyte | Kananga | Tagaytay | Cash For Work (CFW) Program | Drainage Canal Declogging & Desilting @ Sitio Catuogan | Finished |
Leyte | Kananga | Tagaytay | Cash For Work (CFW) Program | Excavation of 200m Water Pipeline | Finished |
Leyte | Kananga | Tugbong | Cash For Work (CFW) Program | Finished | |
Leyte | Kananga | Tugbong | Cash For Work (CFW) Program | Drainage canal rehabilitation (L=600, W=0.6) | Finished |
Leyte | Kananga | Tugbong | Cash For Work (CFW) Program | Lined Canal Construction (L=70m, W=0.4m, D=0.5m) | Finished |
Leyte | Kananga | Tugbong | Cash For Work (CFW) Program | Construction of Make -shift Classroom; Area = 8x16(2Units, 2-CL) | Finished |
Leyte | Kananga | Tugbong | Cash For Work (CFW) Program | Making of Compost Pit | Finished |
Leyte | Kananga | Tugbong | Cash For Work (CFW) Program | Tree Planting | Finished |
Leyte | Mayorga | Pob. Zone 3 | Cash For Work (CFW) Program | Desilting of Existing Canal & Stablishment of Extension Earth Canal (Drainage Canal) | Finished |
Leyte | Mayorga | Pob. Zone 4 | Cash For Work (CFW) Program | Establishment of Earth Canal in School | Finished |
Leyte | Mayorga | Pob. Zone 5 | Cash For Work (CFW) Program | Derooting of Tree Trunks & Land Beautificationin school | Finished |
Leyte | Mayorga | Pob. Zone 6 | Cash For Work (CFW) Program | Painting Works (Ceiling of 10-Classroom) | Finished |
Leyte | Tanauan | Bislig | Cash For Work (CFW) Program | Repair of pathway | Finished |
Leyte | Tanauan | Bislig | Cash For Work (CFW) Program | Establishment of compost pit (5zones) | Finished |
Leyte | Tanauan | Bislig | Cash For Work (CFW) Program | Backfilling ( brgy. Selected site) | Finished |
Leyte | Tanauan | Bislig | Cash For Work (CFW) Program | Establishment of compost pit in school | Finished |
Leyte | Tanauan | Bislig | Cash For Work (CFW) Program | Rehabilitation of school garden | Finished |
Leyte | Tanauan | Bislig | Cash For Work (CFW) Program | Establishment of communal garden (5zones) | Finished |
Province | Town/City | Barangay | Intervention | Details | Status |
---|---|---|---|---|---|
ESamar | Balangkayan | Balogo | Unconditional Cash Transfers | 14 beneficiaries (5 males, 9 females) | Finished |
ESamar | Balangkayan | Cabay | Unconditional Cash Transfers | 32 beneficiaries (11 males, 21 females) | Finished |
ESamar | Balangkayan | Guinpoliran | Unconditional Cash Transfers | 24 beneficiaries (3 males, 11 females) | Finished |
ESamar | Balangiga | Cansumangkay | Unconditional Cash Transfers | 20 beneficiaries (7 males, 13 females) | Finished |
ESamar | Balangiga | Cag-olango | Unconditional Cash Transfers | 10 beneficiaries (5 males, 5 females) | Finished |
ESamar | Balangiga | San Miguel | Unconditional Cash Transfers | 29 beneficiaries (14 males, 15 females) | Finished |
ESamar | Balangiga | Sta. Rosa | Unconditional Cash Transfers | 30 beneficiaries (13 males, 17 females) | Finished |
ESamar | Guiuan | Cogon | Unconditional Cash Transfers | 27 beneficiaries (12 males, 15 females) | Finished |
ESamar | Guiuan | Inapulangan | Unconditional Cash Transfers | 12 beneficiaries (6 males, 6 females) | Finished |
ESamar | Guiuan | Suluan | Unconditional Cash Transfers | 29 beneficiaries (18 males, 11 females) | Finished |
ESamar | Hernani | Garawon | Unconditional Cash Transfers | 21 beneficiaries (10 males, 11 females) | Finished |
ESamar | Hernani | San Isidro | Unconditional Cash Transfers | 11 beneficiaries (6 males, 5 females) | Finished |
WSamar | Basey | Bacubac | Unconditional Cash Transfers | 15 beneficiaries (8 males, 7 females) | Finished |
WSamar | Basey | Catadman | Unconditional Cash Transfers | 20 beneficiaries (12 males, 8 females) | Finished |
WSamar | Basey | Old San Agustin | Unconditional Cash Transfers | 25 beneficiaries (11 males, 14 females) | Finished |
Leyte | Burauen | Buri | Unconditional Cash Transfers | 21 beneficiaries (8 males, 13 females) | Finished |
Leyte | Burauen | Calsadahay | Unconditional Cash Transfers | 11 beneficiaries (3 males, 8 females) | Finished |
Leyte | Burauen | Patong | Unconditional Cash Transfers | 7 beneficiaries (4 males, 3 females) | Finished |
Leyte | Burauen | Hapunan | Unconditional Cash Transfers | 19 beneficiaries (8 males, 11 females) | Finished |
Leyte | Burauen | San Pablo | Unconditional Cash Transfers | 30 beneficiaries (16 males, 14 females) | Finished |
Leyte | Burauen | Villa Aurora | Unconditional Cash Transfers | 19 beneficiaries (11 males, 8 females) | Finished |
Leyte | Dulag | Salvacion | Unconditional Cash Transfers | 17 beneficiaries (6 males, 11 females) | Finished |
Leyte | Kananga | Aguiting | Unconditional Cash Transfers | 22 beneficiaries (7 males, 14 females) | Finished |
Leyte | Kananga | Cacao | Unconditional Cash Transfers | 22 beneficiaries (12 males, 10 females) | Finished |
Leyte | Kananga | Montebello | Unconditional Cash Transfers | 27 beneficiaries (6 males, 21 females) | Finished |
Leyte | Kananga | Tagaytay | Unconditional Cash Transfers | 22 beneficiaries (6 males, 16 females) | Finished |
Leyte | Kananga | Tugbong | Unconditional Cash Transfers | 21 beneficiaries (7 males, 14 females) | Finished |
Leyte | Mayorga | Pob. Zone 3 | Unconditional Cash Transfers | 20 beneficiaries (7 males, 13 females) | Finished |
Leyte | Tanauan | Bislig | Unconditional Cash Transfers | 23 beneficiaries (8 males, 15 females) | Finished |
Province | Town/City | Barangay | Details | Status |
---|---|---|---|---|
ESamar | Balangiga | Cag-olango | Cag-olango Elementary School | Finished |
ESamar | Balangiga | Cansumangkay | Cansumangkay Elementary School | Finished |
ESamar | Balangiga | San Miguel | San Miguel Elementary School | Finished |
ESamar | Balangiga | Sta. Rosa | Sta. Rosa Elementary School | Finished |
ESamar | Balangkayan | Balogo | Balogo Elementary School | Finished |
ESamar | Balangkayan | Cabay | Cabay Elementary School | Finished |
ESamar | Balangkayan | Guinpoliran | Guinpoliran Elementary School | Finished |
ESamar | Guiuan | Cogon | Guiuan National High School | Finished |
ESamar | Guiuan | Inapulangan | Inapulangan Elementary School | |
ESamar | Guiuan | Suluan | Suluan Integrated School | |
ESamar | Hernani | Garawon | Garawon Elementary School | Finished |
ESamar | Hernani | San Isidro | San Isidro Elementary School | Finished |
ESamar | Quinapondan | Poblacion | Quinapondan Central School | Finished |
ESamar | Salcedo | Brgy 2 | Salcedo National High School | |
Leyte | Burauen | Buri | Buri Elementary School | Finished |
Leyte | Burauen | Calsadahay | Calsadahay Elementary School | Finished |
Leyte | Burauen | Hapunan | Hapunan Elementary School | Finished |
Leyte | Burauen | Patong | Patong Elementary School | Finished |
Leyte | Burauen | San Pablo | San Pablo Elementary School | Finished |
Leyte | Burauen | Villa Aurora | Villa Aurora Elementary School | Finished |
Leyte | Dulag | Salvacion | Salvacion Elementary School | Finished |
Leyte | Kananga | Aguiting | Aguiting Elementary School | Finished |
Leyte | Kananga | Cacao | Cacao Elementary School | Finished |
Leyte | Kananga | Kananga | Kananga National High School | Finished |
Leyte | Kananga | Tagaytay | Tagaytay Elementary School | Finished |
Leyte | Kananga | Tugbong | Tugbong Elementary School | Finished |
Leyte | Mayorga | Poblacion | Mayorga Central Elementary School | Finished |
Leyte | Tanauan | Bislig | Bislig Elementary School | Finished |
WSamar | Basey | Bacubac | Bacubac Elementary School | Finished |
WSamar | Basey | Catadman | Catadman Elementary School | Finished |
WSamar | Basey | Old San Agustin | Old San Agustin Elementary School | Finished |
Province | Town/City | Barangay | Intervention | Details | Status |
---|---|---|---|---|---|
ESamar | Balangkayan | Balogo | TVET / TESDA Certified Course | 17 beneficiaries (15 males, 2 females) | Finished |
ESamar | Balangkayan | Cabay | TVET / TESDA Certified Course | 7 beneficiaries (2 males, 5 females) | Finished |
ESamar | Balangkayan | Guinpoliran | TVET / TESDA Certified Course | 5 beneficiaries (3 males, 2 females) | Finished |
ESamar | Balangiga | Cansumangkay | TVET / TESDA Certified Course | 8 beneficiaries (8 males) | Finished |
ESamar | Balangiga | Cag-olango | TVET / TESDA Certified Course | 2 beneficiaries (1 male, 1 female) | Finished |
ESamar | Balangiga | San Miguel | TVET / TESDA Certified Course | 10 beneficiaries (5 males, 5 females) | Finished |
ESamar | Balangiga | Sta. Rosa | TVET / TESDA Certified Course | 2 beneficiaries (2 females) | Finished |
ESamar | Guiuan | Cogon | TVET / TESDA Certified Course | 3 beneficiaries (3 males) | Finished |
ESamar | Guiuan | Inapulangan | TVET / TESDA Certified Course | 11 beneficiaries (9 males, 2 females) | Finished |
ESamar | Guiuan | Suluan | TVET / TESDA Certified Course | 3 beneficiaries (3 males) | Finished |
ESamar | Hernani | Garawon | TVET / TESDA Certified Course | 13 beneficiaries (7 males, 6 females) | Finished |
ESamar | Hernani | San Isidro | TVET / TESDA Certified Course | 5 beneficiaries (3 males, 2 females) | Finished |
WSamar | Basey | Bacubac | TVET / TESDA Certified Course | 6 beneficiaries (4 males, 2 females) | Finished |
WSamar | Basey | Catadman | TVET / TESDA Certified Course | 8 beneficiaries (7 males, 1 female) | Finished |
WSamar | Basey | Old San Agustin | TVET / TESDA Certified Course | 11 beneficiaries (7 males, 4 females) | Finished |
Leyte | Burauen | Buri | TVET / TESDA Certified Course | 7 beneficiaries (5 males, 2 females) | Finished |
Leyte | Burauen | Calsadahay | TVET / TESDA Certified Course | 6 beneficiaries (4 males, 2 females) | Finished |
Leyte | Burauen | Patong | TVET / TESDA Certified Course | 6 beneficiaries (3 males, 3 females) | Finished |
Leyte | Burauen | Hapunan | TVET / TESDA Certified Course | 3 beneficiaries (1 male, 3 females) | Finished |
Leyte | Burauen | San Pablo | TVET / TESDA Certified Course | 6 beneficiaries (4 males, 2 females) | Finished |
Leyte | Burauen | Villa Aurora | TVET / TESDA Certified Course | 13 beneficiaries (6 males, 7 females) | Finished |
Leyte | Dulag | Salvacion | TVET / TESDA Certified Course | 12 beneficiaries (7 males, 5 females) | Finished |
Leyte | Kananga | Aguiting | TVET / TESDA Certified Course | 16 beneficiaries (7 males, 9 females) | Finished |
Leyte | Kananga | Cacao | TVET / TESDA Certified Course | 4 beneficiaries (3 males, 1 female) | Finished |
Leyte | Kananga | Tagaytay | TVET / TESDA Certified Course | 2 beneficiaries (1 male, 1 female) | Finished |
Leyte | Kananga | Tugbong | TVET / TESDA Certified Course | 6 beneficiaries (3 males, 3 females) | Finished |
Leyte | Mayorga | Pob. Zone 3 | TVET / TESDA Certified Course | 4 beneficiaries (3 males, 1 female) | Finished |
Leyte | Tanauan | Bislig | TVET / TESDA Certified Course | 5 beneficiaries (5 males) | Finished |