ADB JFPR Grant 9175 Funded Projects

Projects implemented by DSWD-KALAHI with funding from ADB JFPR Grant 9175:
ProvinceTown/CityBarangayInterventionDetailsStatus
ESamarBalangigaCag-olangoRehabilitation of School Building1 unit: 1CLFinished
ESamarBalangigaCag-olangoProvision of Basic Amenities and Equipment of 4 ES Buildings 0%
ESamarBalangigaCansumangkayRehabilitation of School Building1 unit: 3CLFinished
ESamarBalangigaCansumangkayProvision of Basic Amenities and Equipment of 4 ES Buildings 0%
ESamarBalangigaSan MiguelRehabilitation of School Building1 unit: 2CL & 1 faculty roomFinished
ESamarBalangigaSan MiguelProvision of Basic Amenities and Equipment of 4 ES Buildings 0%
ESamarBalangigaSta. RosaRehabilitation of School Building1 unit: 2CLFinished
ESamarBalangigaSta. RosaProvision of Basic Amenities and Equipment of 4 ES Buildings 0%
ESamarGuiuanPoblacion 8Reconstruction of RHU1 unit97%
ESamarHernaniBatangReconstruction of Barangay Street Lights29 unitsFinished
ESamarHernaniCacatmonanReconstruction of Barangay Street Lights25 unitsFinished
ESamarHernaniCanciledesRehabilitation and Improvement of 465 Lm Drainage Canal with Cover420 l.m. and 45 l.m.Finished
ESamarHernaniCarmenReconstruction of Barangay Street Lights48 unitsFinished
ESamarHernaniNagajaRehabilitation of Relief Distribution and Activity Center1 unitFinished
ESamarHernaniPoblacion 1Reconstruction of Barangay Street Lights11 unitsFinished
ESamarHernaniPoblacion 2Reconstruction of Barangay Street Lights28 unitsFinished
ESamarHernaniPoblacion 3Reconstruction of Water System Level 1 (13 units Jetmatic Pumps)13 unitsFinished
ESamarHernaniSan IsidroReconstruction of Barangay Street Lights39 unitsFinished
ESamarHernaniSan MiguelReconstruction of 90 Lm Drainage Canal with Cover90 l.m.Finished
ESamarSalcedoAsgadRehabilitation of 62 units Barangay Street Lights62 unitsFinished
ESamarSalcedoCaridadRehabilitation of 0.2km Barangay Road0.2 kmFinished
ESamarSalcedoCasilionRehabilitation of Pump Driven Level 2 Water System16 tapstand, 1,517 ln.m96%
ESamarSalcedoIberanRehabilitation of 0.646km Barangay Road0.646 kmFinished
ESamarSalcedoJagnayaRehabilitation of 66 units Barangay Street Lights66 unitsFinished
ESamarSalcedoMaliwaliwRehabilitation of 0.662km Barangay Road.662 KmFinished
ESamarSalcedoPoblacion 12Rehabilitation of 354 Lm Drainage Canal354 LmFinished
ESamarSalcedoSeguinonRehabilitation of 0.612km Barangay Road.612 KmFinished
ESamarSalcedoSta. CruzRehabilitation of Pump Driven Level 2 Water System1 lot well dev., 9 tapstand, 677.50 ln.mFinished
ESamarSalcedoTacla-onRehabilitation of Pump Driven Level 2 Water System12 tapstand, 1,962 ln.mFinished
ESamarSalcedoTagbacanRehabilitation of 0.463km Barangay Road.463 KmFinished
ESamarSulatSan FranciscoRehabilitation of Farm to Market Road1 KM FMRFinished
LeyteJavierAbuyogayRehabilitation/Repair of Marcos Type School Building1unit Sch. Bldg.Finished
LeyteJavierAbuyogayProvision of Basic Amenities and Equipment 0%
LeyteJavierAndres BonifacioRehabilitation of Streetlights18 units Finished
LeyteJavierBatugRehabilitation of Streetlights16 units Finished
LeyteJavierBatugProvision of Basic Amenities and Equipment 0%
LeyteJavierCalzadaRehabilitation/Repair of Barangay Health Station 1 unit Brgy. Health CenterFinished
LeyteJavierCalzadaProvision of Basic Amenities and Equipment 0%
LeyteJavierCaranhugRehabilitation of Streetlights22 units Finished
LeyteJavierCaranhugProvision of Basic Amenities and Equipment 0%
LeyteJavierCarayeRehabilitation of Streetlights15 units Finished
LeyteJavierCarayeProvision of Basic Amenities and Equipment 0%
LeyteJavierCasulonganRehabilitation/Repair of Day Care CenterI unit day careFinished
LeyteJavierCasulonganProvision of Basic Amenities and Equipment 0%
LeyteJavierComatinRehabilitation of Streetlights35 units Finished
LeyteJavierComatinProvision of Basic Amenities and Equipment 0%
LeyteJavierGuindapunanRehabilitation/Repair of Level II Gravity Fed Water System913 lnm & 8 units tapstandFinished
LeyteJavierGuindapunanProvision of Basic Amenities and Equipment 0%
LeyteJavierInayupanRehabilitation of Streetlights25 units Finished
LeyteJavierInayupanProvision of Basic Amenities and Equipment 0%
LeyteJavierLarayRehabilitation of Streetlights25 units Finished
LeyteJavierLarayProvision of Basic Amenities and Equipment 0%
LeyteJavierMagsaysayRehabilitation/Repair of 1CL ES Building1 CL Sch. Bldg.Finished
LeyteJavierMagsaysayProvision of Basic Amenities and Equipment 0%
LeyteJavierMalitbogayRehabilitation/Repair of Level II Gravity Fed Water System1065 ln.m.Finished
LeyteJavierMalitbogayProvision of Basic Amenities and Equipment 0%
LeyteJavierManlilisidRehabilitation of Streetlights26 units Finished
LeyteJavierManlilisidProvision of Basic Amenities and Equipment 0%
LeyteJavierNaliwatanRehabilitation of Streetlights20 units Finished
LeyteJavierNaliwatanProvision of Basic Amenities and Equipment 0%
LeyteJavierOdiongRehabilitation of Streetlights22 units Finished
LeyteJavierOdiongProvision of Basic Amenities and Equipment 0%
LeyteJavierPicas NorteRehabilitation of Streetlights28 units Finished
LeyteJavierPicas NorteProvision of Basic Amenities and Equipment 0%
LeyteJavierPoblacion Zone 1Rehabilitation of Streetlights24 units Finished
LeyteJavierPoblacion Zone 1Provision of Basic Amenities and Equipment 0%
LeyteJavierSta. CruzRehabilitation/Repair of Day Care Center1 unit Day Care CenterFinished
LeyteJavierSta. CruzProvision of Basic Amenities and Equipment 0%
LeyteJavierTalisayanRehabilitation/Repair of 1CL ES Building1 CL Sch. Bldg.Finished
LeyteJavierTalisayanProvision of Basic Amenities and Equipment 0%
LeyteKanangaCacaoReconstruction of 1 unit 2CL ES Building1 unit 2 CL School Bldg90.02%
LeyteKanangaKawayanReconstruction of 1 unit 2CL SS Building1 unit 2 CL School Bldg57.60%
LeyteKanangaMontebelloReconstruction of 1 unit 1CL ES Building1 unit 1 CL School Bldg43.80%
LeyteKanangaTugbongReconstruction of 1 unit 2CL ES Building1 unit 2 CL School BldgFinished
LeyteLeyteBelenRehabilitation of Water System1 unit Intake Box, 2 units Reservoir and 7 Tapstand89.03%
LeyteLeyteElizabethRehabilitation of Hanging Bridge78 Lm Bridge61.40%
LeyteLeytePalid IIReconstruction of 1 unit 2CL2 Classrooms -126 sq.m58%
LeyteMahaplagCampinRepair of Water System Level II1 system, 792 ln.mFinished
LeyteMahaplagCampinProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagCuatro de AgostoRehabilitation of 24 units Street Light Post24 units, 1,400 ln.mFinished
LeyteMahaplagCuatro de AgostoProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagHiluctoganRepair of Hanging Bridge II Finished
LeyteMahaplagHiluctoganProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagHilusigRehabilitation of 16 units Street Light Post16 units, 1,320 ln.m.Finished
LeyteMahaplagHilusigProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagHimamaraRepair of Water System Level II1,044 ln.mFinished
LeyteMahaplagHimamaraProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagHinaguimitanRepair of Barangay Hall Building 1 Unit Brangay Health CenterFinished
LeyteMahaplagHinaguimitanProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagLiberacionImprovement of Water System Level II968 ln.m.Finished
LeyteMahaplagLiberacionProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagMabuhayImprovement of 1.20m diameter RCPC and 10m Pathwalk10 pcs RCPC, 10 ln.mFinished
LeyteMahaplagMabuhayProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagMabungaImprovement of 49m River Flood Control Protection49 ln.mFinished
LeyteMahaplagMabungaProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagMagsuganaoRepair of Water System Level II1,400 ln.mFinished
LeyteMahaplagMagsuganaoProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagMahayagRepair of Barangay Health Center1 Unit Brangay Health CenterFinished
LeyteMahaplagMahayagProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagMahayahayRehabilitation of 0.085km FTMR0.080 km.Finished
LeyteMahaplagMahayahayProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagMaligayaRepair of Day Care Center20 sq.mFinished
LeyteMahaplagMaligayaProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagMalinaoRepair of Water System Level II1 system, 1,374 ln.m.Finished
LeyteMahaplagMalinaoProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagMalipoonRepair of Palanogan Spillway Road Going to Malipoon17.4 sq.m.Finished
LeyteMahaplagPalanoganRepair of 0.122km PCCP FTMR0.122 kmFinished
LeyteMahaplagPalanoganProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagParilRepair of School Building49.0 sq.mFinished
LeyteMahaplagParilProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagPinamono-anRehabilitation of 0.091km FTMR0.088 kmFinished
LeyteMahaplagPoblacionRepair of School Building57.6 sq.m.Finished
LeyteMahaplagPoblacionProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagPolahongonRepair of Water System Level II1 system, 680 ln.mFinished
LeyteMahaplagPolahongonProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagSan IsidroRehabilitation of 0.084km FTMR0.084 km.Finished
LeyteMahaplagSan JuanRehabilitation of 0.150km FTMR0.150 kmFinished
LeyteMahaplagSta. CruzRehabilitation of 0.094km FTMR0.090 km.Finished
LeyteMahaplagSto. NiñoRepair of Barangay Hall Building35.0 sq.mFinished
LeyteMahaplagSto. NiñoProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagTagaytayRepair of Barangay Hall Bldg1 Unit Brangay HallFinished
LeyteMahaplagTagaytayProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagUguisRepair of Water System Level II500 ln.mFinished
LeyteMahaplagUguisProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagUnionRepair of Barangay Hall Building1 Unit Brangay HallFinished
LeyteMahaplagUnionProvision of Basic Amenities and Equipment  Finished
LeyteMahaplagUpperRehabilitation of 27 units Street Light Post27 units, 1,520 ln.mFinished
LeyteMayorgaGen. A. LunaRehabilitation/Improvement of Streetlights22 unitsFinished
LeyteMayorgaLibertyRehabilitation/Improvement of Streetlights24 unitsFinished
LeyteMayorgaPoblacion Zone IIIRehabilitation/Improvement of Streetlights30 unitsFinished
LeyteMayorgaUnionRehabilitation/Improvement of Streetlights23 unitsFinished
LeyteTanauanAradoRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanBangonConstruction of Gravity Fed Water System Level 2Tramission pipes0%
LeyteTanauanBangonRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanBangonRehabilitation of Streetlights *see San VictorFinished
LeyteTanauanBantaganRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanBisligReconstruction of School Building1 unit: 2CL, 1 unit: 1CLFinished
LeyteTanauanBuntayRehabilitation of Streetlights *see San RoqueFinished
LeyteTanauanCabarasan GutiRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanCabuynanRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanCahumayhumayanRehabilitation of Streetlights *see PagoFinished
LeyteTanauanCalsadahayConstruction of Gravity Fed Water System Level 2Tramission pipes0%
LeyteTanauanCalsadahayRehabilitation of Streetlights *see San VictorFinished
LeyteTanauanCanramosRehabilitation of Streetlights *see San RoqueFinished
LeyteTanauanCatmonRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanGuindag-anRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanGuingauanRehabilitation of Streetlights *see PagoFinished
LeyteTanauanHilagpadRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanKilingRehabilitation of Streetlights *see PagoFinished
LeyteTanauanLapayRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanLikodRehabilitation of Streetlights *see San RoqueFinished
LeyteTanauanLimbuhan DacuRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanLimbuhan GutiRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanMaghulodRehabilitation of Streetlights256 - 17 barangaysFinished
LeyteTanauanMalaguicayRehabilitation of Streetlights *see PagoFinished
LeyteTanauanMaribiRehabilitation of Streetlights *see PagoFinished
LeyteTanauanPagoRehabilitation of Streetlights95 units - 7 barangaysFinished
LeyteTanauanSacmeRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanSalvadorConstruction of Gravity Fed Water System Level 2Tramission pipes0%
LeyteTanauanSalvadorRehabilitation of Streetlights *see PagoFinished
LeyteTanauanSan IsidroRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanSan MiguelRehabilitation of Streetlights *see San RoqueFinished
LeyteTanauanSan RoqueRehabilitation of Streetlights135 units - 5 barangaysFinished
LeyteTanauanSan VictorRehabilitation of Streetlights127 units - 3 barangaysFinished
LeyteTanauanSta. ElenaRehabilitation of Streetlights *see MaghulodFinished
LeyteTanauanTalaloraRehabilitation of Streetlights *see MaghulodFinished
WSamarBaseyAmandayehanRehabilitation of Gravity Fed Water Sytem Level II 90%
WSamarBaseyBaludReconstruction of Day Care Center1 Unit Day Care CenterFinished
WSamarBaseyBaybayRepair/Rehabilitation of Drainage Canal Finished
WSamarBaseyBinongtu-anImprovement of Drainage Canal Finished
WSamarBaseyCambayanRepair/Rehabilitation of Concrete Box Culvert and Riprapping of Creek Embankment Finished
WSamarBaseyCogonRehabilitation of School Building (3CL)3 Class Rooms95.80%
WSamarBaseyDolonganRehabilitation of Gravity Fed Water Sytem Level II1 Unit Day Care CenterFinished
WSamarBaseyGuirangRehabilitation of Gravity Fed Water Sytem Level II 39.80%
WSamarBaseyMabiniRehabilitation of Concrete Pathwalk Finished
WSamarBaseyMagallanesImprovement of Concrete Pathwalk  Finished
WSamarBaseyPelitImprovement of Concrete Pathwalk  Finished
WSamarBaseyRoxasRehabilitation of Barangay Hall1 Unit Brangay Hall90.60%
WSamarBaseySugcaImprovement of Conrete Pathwalk Finished
WSamarBaseyVilla AuroraImprovement of Concrete Pathwalk  Finished
WSamarMarabutAmambucaleImprovement of Level 1 Water System Finished
WSamarMarabutAmantilloImprovement of Street Lights8 UnitsFinished
WSamarMarabutLegaspiImprovement of Street Lights9 UnitsFinished
WSamarMarabutLipataRehabilitation of Barangay Road0.0536 kmFinished
WSamarMarabutMalobagoImprovement of Level 2 Water System 5 tapstands92%
WSamarMarabutOdocImprovement of 15 Lm Seawall15 linear metersFinished
WSamarMarabutOsmenaImprovement of Level 2 Water System  Finished
WSamarMarabutPanan-awanImprovement of Level 2 Water System *see OsmenaFinished
WSamarMarabutPinamitinanImprovement of Level 2 Water System 8 tapstands97.90%
WSamarMarabutRoñoImprovement of Street Lights8 UnitsFinished
WSamarMarabutSan RoqueImprovement of Concrete Pathwalk 0.416 kmFinished
WSamarMarabutSto. NiñoImprovement of Drainage Canal114.40 linear metersFinished
WSamarMarabutTinabananImprovement of Farm to Market Road0.27 kmFinished



School Projects of Plan International with funding from ADB JFPR Grant 9175:
ESamarBalangigaCag-olangoConstruction of 4 New ClassroomsCag-olango Elementary SchoolFinished
ESamarBalangigaCansumangkayConstruction of 1 New ClassroomCansumangkay Elementary SchoolFinished
ESamarBalangigaSan MiguelConstruction of 2 New ClassroomsSan Miguel Elementary SchoolFinished
ESamarBalangigaSta. RosaConstruction of 2 New ClassroomsSta. Rosa Elementary SchoolFinished
ESamarBalangkayanBalogoConstruction of 2 New ClassroomsBalogo Elementary SchoolFinished
ESamarBalangkayanCabayRepair of 2 ClassroomsCabay Elementary SchoolFinished
ESamarBalangkayanGuinpoliranRepair of 3 ClassroomsGuinpoliran Elementary SchoolFinished
ESamarGuiuanCogonConstruction of 11 New ClassroomsGuiuan National High SchoolFinished
ESamarGuiuanInapulanganConstruction of 1 New ClassroomInapulangan Elementary School 
ESamarGuiuanSuluanConstruction of 6 New ClassroomsSuluan Integrated School 
ESamarHernaniGarawonRepair of 2 ClassroomsGarawon Elementary SchoolFinished
ESamarHernaniSan IsidroConstruction of 1 New ClassroomSan Isidro Elementary SchoolFinished
ESamarQuinapondanBarangay 3Construction of 2 New Classrooms and Repair of 6 ClassroomsQuinapondan Central SchoolFinished
ESamarSalcedoBarangay 9Relocation of entire school to higher groundsSalcedo National High School 
LeyteBurauenBuriRepair of 2 ClassroomsBuri Elementary SchoolFinished
LeyteBurauenCalsadahayConstruction of 1 New ClassroomCalsadahay Elementary SchoolFinished
LeyteBurauenHapunanConstruction of 1 New Classroom & Repair of 1 ClassroomHapunan Elementary SchoolFinished
LeyteBurauenPatongConstruction of 2 New ClassroomsPatong Elementary SchoolFinished
LeyteBurauenSan PabloConstruction of 4 New ClassroomsSan Pablo Elementary SchoolFinished
LeyteBurauenVilla AuroraConstruction of 3 New Classrooms & Repair of 1 ClassroomVilla Aurora Elementary SchoolFinished
LeyteDulagSalvacionConstruction of 4 New ClassroomsSalvacion Elementary SchoolFinished
LeyteKanangaAguitingRepair of 4 ClassroomsAguiting Elementary SchoolFinished
LeyteKanangaCacaoConstruction of 3 New ClassroomsCacao Elementary SchoolFinished
LeyteKanangaMontebelloRepair of 5 ClassroomsKananga National High SchoolFinished
LeyteKanangaTagaytayConstruction of 1 New Classroom & Repair of 2 ClassroomsTagaytay Elementary SchoolFinished
LeyteKanangaTugbongConstruction of 2 New ClassroomsTugbong Elementary SchoolFinished
LeyteMayorgaPob. Zone 3Construction of 3 New ClassroomsMayorga Central Elementary SchoolFinished
LeyteTanauanBisligRepair of 8 ClassroomsBislig Elementary SchoolFinished
WSamarBaseyBacubacConstruction of 2 New ClassroomsBacubac Elementary SchoolFinished
WSamarBaseyCatadmanRelocation of entire school (2 Buildings, 5 Classrooms)Catadman Elementary SchoolFinished
WSamarBaseyOld San AgustinConstruction of 4 New ClassroomsOld San Agustin Elementary SchoolFinished



Cash For Work Program of Plan International funded 100% by ADB JFPR Grant 9175:
ProvinceTown/CityBarangayInterventionDetailsStatus
ESamarBalangkayanBalogoCash For Work (CFW) ProgramConcreting of School Pathways (44 sq.m)Finished
ESamarBalangkayanBalogoCash For Work (CFW) ProgramConcreting of Barangay RoadFinished
ESamarBalangkayanBalogoCash For Work (CFW) ProgramBackyard hole land filling and levellingFinished
ESamarBalangkayanBalogoCash For Work (CFW) ProgramRehab/widening of Barangay DrainageFinished
ESamarBalangkayanBalogoCash For Work (CFW) ProgramRe graveling of Brgy Road (aggregate base course)Finished
ESamarBalangkayanBalogoCash For Work (CFW) ProgramRepair / Rehab of Makeshift Classroom Finished
ESamarBalangkayanBalogoCash For Work (CFW) ProgramWindow Grills Installation (Wooden Type)Finished
ESamarBalangkayanBalogoCash For Work (CFW) ProgramCompost Pit MakingFinished
ESamarBalangkayanBalogoCash For Work (CFW) ProgramSchool Perimeter Wooden Pole Fencing Finished
ESamarBalangkayanBalogoCash For Work (CFW) ProgramSchool DrainageFinished
ESamarBalangkayanBalogoCash For Work (CFW) ProgramRepainting of School Classrooms Finished
ESamarBalangkayanCabayCash For Work (CFW) ProgramGrouted Riprap (Salak River)Finished
ESamarBalangkayanCabayCash For Work (CFW) ProgramGrouted Riprap & patching of Coastal PathwayFinished
ESamarBalangkayanCabayCash For Work (CFW) ProgramRepair/ Rehab of Cultural StageFinished
ESamarBalangkayanCabayCash For Work (CFW) ProgramOld Plaza Perimeter FenceFinished
ESamarBalangkayanCabayCash For Work (CFW) ProgramBrgy Drainage ExcavationFinished
ESamarBalangkayanCabayCash For Work (CFW) ProgramTree Planting (Fruit Tree and Malobago Tree)Finished
ESamarBalangkayanCabayCash For Work (CFW) ProgramSeedling Briquette ProductionFinished
ESamarBalangkayanGuinpoliranCash For Work (CFW) ProgramRehab / Upgrading of Pathway to Water SourceFinished
ESamarBalangkayanGuinpoliranCash For Work (CFW) ProgramSurfacing of Brgy RoadFinished
ESamarBalangkayanGuinpoliranCash For Work (CFW) ProgramEarth Canal ExcavationFinished
ESamarBalangigaCansumangkayCash For Work (CFW) ProgramExcavation of Drainage CanalFinished
ESamarBalangigaCansumangkayCash For Work (CFW) ProgramDecloging of Existing Drainage CanalFinished
ESamarBalangigaCansumangkayCash For Work (CFW) ProgramCommunal GardenFinished
ESamarBalangigaCag-olangoCash For Work (CFW) ProgramConstruction of School Perimeter Fence (200m)Finished
ESamarBalangigaCag-olangoCash For Work (CFW) ProgramDemolition of School BuildingFinished
ESamarBalangigaCag-olangoCash For Work (CFW) ProgramRehabilitation of Water SystemFinished
ESamarBalangigaCag-olangoCash For Work (CFW) ProgramConstruction of Vermi HouseFinished
ESamarBalangigaCag-olangoCash For Work (CFW) ProgramTree PlantingFinished
ESamarBalangigaCag-olangoCash For Work (CFW) ProgramEstablishment of Vegetable Gardening (10x20)Finished
ESamarBalangigaSan MiguelCash For Work (CFW) ProgramConstruction of Perimeter Fence, San Miguel Elem SchoolFinished
ESamarBalangigaSan MiguelCash For Work (CFW) ProgramFabrication of Drainage canal concrete cover, San Miguel Elem SchoolFinished
ESamarBalangigaSan MiguelCash For Work (CFW) ProgramConstruction of Compost Pit, San Miguel Elem SchoolFinished
ESamarBalangigaSan MiguelCash For Work (CFW) ProgramConstruction of Tree Guard, Farm to Market RoadFinished
ESamarBalangigaSan MiguelCash For Work (CFW) ProgramTree Planting, Farm to Market RoadFinished
ESamarBalangigaSan MiguelCash For Work (CFW) ProgramDeclogging of Drainage Canal, Purok 2Finished
ESamarBalangigaSan MiguelCash For Work (CFW) ProgramEstablishment of Demo FarmFinished
ESamarBalangigaSan MiguelCash For Work (CFW) Program Vegetable GardeningFinished
ESamarBalangigaSan MiguelCash For Work (CFW) Program Corn PlantationFinished
ESamarBalangigaSan MiguelCash For Work (CFW) ProgramSeedling Briquette ProductionFinished
ESamarBalangigaSan MiguelCash For Work (CFW) ProgramEstablishment of Mangrove NurseryFinished
ESamarBalangigaSta. RosaCash For Work (CFW) ProgramConstruction of School Perimeter fenceFinished
ESamarBalangigaSta. RosaCash For Work (CFW) ProgramCompost pitFinished
ESamarBalangigaSta. RosaCash For Work (CFW) ProgramDeclogging of CanalFinished
ESamarBalangigaSta. RosaCash For Work (CFW) ProgramTree plantingFinished
ESamarBalangigaSta. RosaCash For Work (CFW) ProgramRegravelling of brgy roadsFinished
ESamarBalangigaSta. RosaCash For Work (CFW) ProgramRehabilitation of street lightsFinished
ESamarBalangigaSta. RosaCash For Work (CFW) ProgramConstruction of Vermi houseFinished
ESamarBalangigaSta. RosaCash For Work (CFW) ProgramSeedling Briquette ProductionFinished
ESamarGuiuanCogonCash For Work (CFW) ProgramConstruction of Earth CanalFinished
ESamarGuiuanCogonCash For Work (CFW) ProgramConstruction of Compost PitFinished
ESamarGuiuanCogonCash For Work (CFW) ProgramConstruction of Material Recovery of Facilities (MRF)Finished
ESamarGuiuanCogonCash For Work (CFW) ProgramGardening for Malnourish Children (community)Finished
ESamarGuiuanCogonCash For Work (CFW) ProgramSchool Gardening, Guiuan National High SchoolFinished
ESamarGuiuanCogonCash For Work (CFW) ProgramConcreting of RoadFinished
ESamarGuiuanCogonCash For Work (CFW) ProgramConstruction of Roof shed for Water PumpFinished
ESamarGuiuanCogonCash For Work (CFW) ProgramFixing of DCC WindowsFinished
ESamarGuiuanCogonCash For Work (CFW) ProgramInstallation of Street light PoleFinished
ESamarGuiuanCogonCash For Work (CFW) ProgramDemolition of Classroom , Guiuan National High SchoolFinished
ESamarGuiuanInapulanganCash For Work (CFW) ProgramUnderwater clean upFinished
ESamarGuiuanInapulanganCash For Work (CFW) ProgramFabrication of Artificial coral reefFinished
ESamarGuiuanInapulanganCash For Work (CFW) ProgramDam Construction: Clearing of River WaysFinished
ESamarGuiuanInapulanganCash For Work (CFW) ProgramDam Construction: Filling of GravelFinished
ESamarGuiuanInapulanganCash For Work (CFW) ProgramConstruction of Bridge (Forms installation)Finished
ESamarGuiuanInapulanganCash For Work (CFW) ProgramInstallation of Flaglets and bouysFinished
ESamarGuiuanInapulanganCash For Work (CFW) ProgramDevelopment of Rice FarmFinished
ESamarGuiuanInapulanganCash For Work (CFW) ProgramDemolition of 2 classrooms (size: 7x9)Finished
ESamarGuiuanInapulanganCash For Work (CFW) ProgramRehabilitation of 300 meters irrigation canalFinished
ESamarGuiuanSuluanCash For Work (CFW) ProgramBurying of Water Pipe Line (from source to poblacion) Finished
ESamarGuiuanSuluanCash For Work (CFW) ProgramRetrieving of erected wooden post at SeaFinished
ESamarGuiuanSuluanCash For Work (CFW) ProgramDemolition/ Dismantling of Destroyed Houses (House of donato Abulencia), All PuroksFinished
ESamarGuiuanSuluanCash For Work (CFW) ProgramDismantling of Destroyed Houses ( 8units)Finished
ESamarGuiuanSuluanCash For Work (CFW) ProgramDemolition of School Building, Suluan Intergrated SchoolFinished
ESamarGuiuanSuluanCash For Work (CFW) ProgramClearing of access to Caves # IIFinished
ESamarGuiuanSuluanCash For Work (CFW) ProgramClearing of DeepwellFinished
ESamarGuiuanSuluanCash For Work (CFW) ProgramTile setting fixtures, Day Care Center(DCC) paintingFinished
ESamarGuiuanSuluanCash For Work (CFW) ProgramDrainage canalFinished
ESamarGuiuanSuluanCash For Work (CFW) ProgramCompost pit with fenceFinished
ESamarGuiuanSuluanCash For Work (CFW) Program Clearing & Garbage DisposalFinished
ESamarGuiuanSuluanCash For Work (CFW) ProgramConcrete wall (school fencing)Finished
ESamarGuiuanSuluanCash For Work (CFW) ProgramFencing Rear sideFinished
ESamarGuiuanSuluanCash For Work (CFW) ProgramRemoval of TreeFinished
ESamarHernaniGarawonCash For Work (CFW) ProgramDemolition of Bunkhouse Finished
ESamarHernaniGarawonCash For Work (CFW) ProgramPotting (Multi- nursery)Finished
ESamarHernaniGarawonCash For Work (CFW) ProgramExcavation of Deepwell at Multi Purpose NurseryFinished
ESamarHernaniGarawonCash For Work (CFW) ProgramCompost Pit MakingFinished
ESamarHernaniGarawonCash For Work (CFW) ProgramConstruction of CottageFinished
ESamarHernaniGarawonCash For Work (CFW) ProgramSchool Perimeter Wooden Pole FencingFinished
ESamarHernaniGarawonCash For Work (CFW) ProgramExcavation of Irrigation Canal, Sitio ManglosFinished
ESamarHernaniGarawonCash For Work (CFW) ProgramExcavation of Earth CanalFinished
ESamarHernaniGarawonCash For Work (CFW) ProgramRehabilitation of Child-Friendly Evacuation RouteFinished
ESamarHernaniSan IsidroCash For Work (CFW) ProgramRehabilitation of Water System ( Pipe Line)Finished
ESamarHernaniSan IsidroCash For Work (CFW) ProgramRepair of 3 units Foot BridgeFinished
ESamarHernaniSan IsidroCash For Work (CFW) ProgramExcavation of Drainage Canal/ Compost PitFinished
ESamarHernaniSan IsidroCash For Work (CFW) ProgramConstruction of School Perimater FenceFinished
ESamarSalcedoBarangay 9Cash For Work (CFW) ProgramMangrove Nursery EstablishmentFinished
ESamarQuinapondanBarangay 3Cash For Work (CFW) ProgramForest Tree PlantingFinished
WSamarBaseyBacubacCash For Work (CFW) ProgramBridge & Canal Cleaning (2-Units) Finished
WSamarBaseyBacubacCash For Work (CFW) ProgramShoreline Clearing & RestorationFinished
WSamarBaseyBacubacCash For Work (CFW) ProgramPainting of Daycare CenterFinished
WSamarBaseyBacubacCash For Work (CFW) ProgramRepair of Roofing & Sidings of Make-shift Classroom; Area= 10x7 (1-Unit)Finished
WSamarBaseyBacubacCash For Work (CFW) ProgramCutting of Coconut Trees (affected by school construction)Finished
WSamarBaseyBacubacCash For Work (CFW) ProgramCanal Rehabilitation (Along Brgy. Rd. L=400m, & Along Zone 5 L=80m; Assumption: W=0.5m, D=0.6m)Finished
WSamarBaseyBacubacCash For Work (CFW) ProgramPainting Works ( Existing Roofing of 4-Classrooms & Junior Fence 120 LmFinished
WSamarBaseyBacubacCash For Work (CFW) ProgramMaking of Junior Fence (Concrete) 10mFinished
WSamarBaseyBacubacCash For Work (CFW) ProgramExcavation of Drainage Canal (L=200, W=0.4m, D=0.35m)Finished
WSamarBaseyCatadmanCash For Work (CFW) ProgramRehabilitation of Earth Canal @ Roadside (L=700m, W=0.6, D=0.6)Finished
WSamarBaseyCatadmanCash For Work (CFW) ProgramConstruction of Demo House (4x10m)Finished
WSamarBaseyCatadmanCash For Work (CFW) ProgramEstablishment of Earth Canal (L=150m, W=0.6, D=0.6)in schoolFinished
WSamarBaseyCatadmanCash For Work (CFW) ProgramAccess RoadFinished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramCanal Rehabilitation (Canal 1 = 200m, Canal 2 = 200m)Finished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramCleaning of Public Wells (8 Wells)Finished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramConstruction of Perimeter Fence Finished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramPainting Works(8 classrooms)Finished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramEarth Canal (300m)Finished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramEstablishment of Compost Pit (5m x 5m x 5')Finished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramLand PreparationFinished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramRehabilitation of Perimeter Fence @ Manila-ay (15m)Finished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramCleaning of School Wells (1 Well)Finished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramSchool NurseryFinished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramDemolition of Wooden Make-shift BuildingFinished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramEstablishment of compost pitFinished
WSamarBaseyOld San AgustinCash For Work (CFW) ProgramCanal RehabilitationFinished
LeyteBurauenBuriCash For Work (CFW) ProgramCommunal Gardening (1.6 hectare)Finished
LeyteBurauenBuriCash For Work (CFW) ProgramDemo Farm (0.5 hectare)Finished
LeyteBurauenBuriCash For Work (CFW) ProgramEstablishment of Children's Play GroundFinished
LeyteBurauenCalsadahayCash For Work (CFW) ProgramPathway (L=150+300m, W=1.0m, Thk=0.35m) Finished
LeyteBurauenCalsadahayCash For Work (CFW) ProgramEstablishment of Compost pit (7 zones @2 units) Finished
LeyteBurauenPatongCash For Work (CFW) ProgramExcavation of Earth Canal (L=270m, W=0.6m, D=1.0m)Finished
LeyteBurauenPatongCash For Work (CFW) ProgramEstablishment of Compost Pit (3.0mWx4.0mLx1.8mD - 4 units)Finished
LeyteBurauenPatongCash For Work (CFW) ProgramRepair of School Fence (Light Materials only) - 400mFinished
LeyteBurauenPatongCash For Work (CFW) ProgramRepair of Recovery Room (13x10m), Light Materials onlyFinished
LeyteBurauenPatongCash For Work (CFW) ProgramRepair Social Hall in School (4x5m)Finished
LeyteBurauenHapunanCash For Work (CFW) ProgramConstruction of Drainage Canal & Road PatchingFinished
LeyteBurauenSan PabloCash For Work (CFW) ProgramBrgy. Road Rehabilitation (patching) L=250m Finished
LeyteBurauenSan PabloCash For Work (CFW) ProgramEarth Canal (L=300m, W=0.5m, D=0.6m ) Finished
LeyteBurauenSan PabloCash For Work (CFW) ProgramEstablishment of compost pit per purok (7 units) Finished
LeyteBurauenVilla AuroraCash For Work (CFW) ProgramFencing (Light Materials Only) 150LM Finished
LeyteBurauenVilla AuroraCash For Work (CFW) ProgramFencing for GUAT Production (Light Materials Only) 450LMFinished
LeyteBurauenVilla AuroraCash For Work (CFW) ProgramConstruction of Warehouse (Light Materials) 5 x 4mFinished
LeyteBurauenVilla AuroraCash For Work (CFW) ProgramEstablishment of Nursery House (in School)Finished
LeyteBurauenVilla AuroraCash For Work (CFW) ProgramEstablishment of Community Nursery HouseFinished
LeyteBurauenVilla AuroraCash For Work (CFW) ProgramConstruction of Multi- Purpose Cottage (Light Materials) 3x 3mFinished
LeyteBurauenVilla AuroraCash For Work (CFW) ProgramLand Development (Landscaping/ Levelling) for Crops DryerFinished
LeyteBurauenVilla AuroraCash For Work (CFW) ProgramWater Pipeline Repair & RehabilitationFinished
LeyteBurauenVilla AuroraCash For Work (CFW) ProgramFencing (Light Materials Only) 750LM (School)Finished
LeyteDulagSalvacionCash For Work (CFW) ProgramRehabilitation of Multi-purpose hall fence Finished
LeyteDulagSalvacionCash For Work (CFW) ProgramReplacement of Tarpaulin Roofing of the H.E. Room Finished
LeyteDulagSalvacionCash For Work (CFW) ProgramRepair of barangay outpost Finished
LeyteDulagSalvacionCash For Work (CFW) ProgramRepair for the concrete bench (bleacher) of the multi-purpose hall Finished
LeyteDulagSalvacionCash For Work (CFW) ProgramRemoval & Replacement of Cyclone Fencing of the School Perimeter Finished
LeyteDulagSalvacionCash For Work (CFW) ProgramRehabilitation of School Garden Finished
LeyteDulagSalvacionCash For Work (CFW) ProgramEstablishment of compost pit per purok (5puroks) Finished
LeyteDulagSalvacionCash For Work (CFW) ProgramCommunal garden per purok (5 puroks) Finished
LeyteDulagSalvacionCash For Work (CFW) ProgramRoot crop nursery Finished
LeyteDulagSalvacionCash For Work (CFW) ProgramEstablishment of Compost Pit in School Finished
LeyteDulagSalvacionCash For Work (CFW) ProgramEarth canal Finished
LeyteKanangaAguitingCash For Work (CFW) ProgramRepair/Rehabilitation of StageFinished
LeyteKanangaAguitingCash For Work (CFW) Program(Solid Waste Management) Repair of Existing MRF & Establishment of Compost PitFinished
LeyteKanangaAguitingCash For Work (CFW) ProgramRepair of Temporary Fence @ Rear Portion of the School Campus (Used G.I. Sheets w/ Wooden Post)Finished
LeyteKanangaAguitingCash For Work (CFW) ProgramRehabilitation of drain & Link RoadFinished
LeyteKanangaAguitingCash For Work (CFW) ProgramRehabilitation of Water Pipeline 1000m and Cleaning/Clearing of 1 unit Water Concrete Tank Finished
LeyteKanangaAguitingCash For Work (CFW) ProgramConstruction of Piggery House for ACA Project; Assumption: for 10 pigs CapacityFinished
LeyteKanangaAguitingCash For Work (CFW) ProgramConstruction of Vermi Bin and Housing (1 Unit) Assumption: 4x4mFinished
LeyteKanangaAguitingCash For Work (CFW) ProgramRepair & Rehabilitation of Tanod OutpostFinished
LeyteKanangaAguitingCash For Work (CFW) ProgramConstruction of Daycare Center (7x8m)Finished
LeyteKanangaAguitingCash For Work (CFW) ProgramRep-rap of Pathway at Sitio Balimbing (30m)Finished
LeyteKanangaAguitingCash For Work (CFW) ProgramConstruction of ACA Recovery Room & Meeting HallFinished
LeyteKanangaCacaoCash For Work (CFW) ProgramWater Pipeline Repair/Rehabilitation (L= 200+100+200m)Finished
LeyteKanangaCacaoCash For Work (CFW) ProgramDrainage Canal Rehabilitation (Purok Manga L=100m, Purok Tambis-Santol-Caimito L=200m)Finished
LeyteKanangaCacaoCash For Work (CFW) ProgramCommunal GardenFinished
LeyteKanangaCacaoCash For Work (CFW) ProgramRepair/Rehabilitation of Perimeter Fence (Cyclone Fence)Finished
LeyteKanangaCacaoCash For Work (CFW) ProgramDredging of CanalFinished
LeyteKanangaCacaoCash For Work (CFW) ProgramTree Planting in Community & in SchoolFinished
LeyteKanangaMontebelloCash For Work (CFW) ProgramConstruction of footstep @Zone PlutoFinished
LeyteKanangaMontebelloCash For Work (CFW) ProgramDrainage Canal Rehabilitation (L=1120m, W=0.5m)Finished
LeyteKanangaMontebelloCash For Work (CFW) ProgramTree PlantingFinished
LeyteKanangaMontebelloCash For Work (CFW) ProgramSchool Gardening & BeautificationFinished
LeyteKanangaMontebelloCash For Work (CFW) ProgramDemolition of Public CR Finished
LeyteKanangaMontebelloCash For Work (CFW) ProgramDemolition of Nursery @ School and School Perimeter FencingFinished
LeyteKanangaMontebelloCash For Work (CFW) ProgramRepair of Material Recovery Facility (10'x14')Finished
LeyteKanangaMontebelloCash For Work (CFW) ProgramRepair & Repainting of School Perimeter Fence (50m)Finished
LeyteKanangaMontebelloCash For Work (CFW) ProgramRepair & Repainting of Plant Boxes (at School)Finished
LeyteKanangaMontebelloCash For Work (CFW) ProgramSchool GardeningFinished
LeyteKanangaMontebelloCash For Work (CFW) ProgramTampering of School GroundFinished
LeyteKanangaMontebelloCash For Work (CFW) ProgramRepair & Repainting of School FurnitureFinished
LeyteKanangaMontebelloCash For Work (CFW) ProgramEstablishment of Warehouse for Farmer Common Service Facilities (5x9m)Finished
LeyteKanangaMontebelloCash For Work (CFW) ProgramDemolition of Abandoned School CR and Rehabilitationof school Water PipelineFinished
LeyteKanangaMontebelloCash For Work (CFW) ProgramRoad Patching and Compaction 200m (From Sitio Jupiter to Highway)Finished
LeyteKanangaTagaytayCash For Work (CFW) ProgramWater Pipeline Repair/Rehabilitation (L= 3000m)Finished
LeyteKanangaTagaytayCash For Work (CFW) ProgramConstruction of Perimeter Fence (400LM)in SchoolFinished
LeyteKanangaTagaytayCash For Work (CFW) ProgramConstruction of Jetmatic Pump (1-set)Finished
LeyteKanangaTagaytayCash For Work (CFW) ProgramExcavation of 5 School Compost PitFinished
LeyteKanangaTagaytayCash For Work (CFW) ProgramBeautification & Excavation of Temporary Drainage CanalFinished
LeyteKanangaTagaytayCash For Work (CFW) ProgramDrainage Canal Declogging & Desilting @ Sitio CatuoganFinished
LeyteKanangaTagaytayCash For Work (CFW) ProgramExcavation of 200m Water PipelineFinished
LeyteKanangaTugbongCash For Work (CFW) Program Finished
LeyteKanangaTugbongCash For Work (CFW) ProgramDrainage canal rehabilitation (L=600, W=0.6) Finished
LeyteKanangaTugbongCash For Work (CFW) ProgramLined Canal Construction (L=70m, W=0.4m, D=0.5m) Finished
LeyteKanangaTugbongCash For Work (CFW) ProgramConstruction of Make -shift Classroom; Area = 8x16(2Units, 2-CL) Finished
LeyteKanangaTugbongCash For Work (CFW) ProgramMaking of Compost PitFinished
LeyteKanangaTugbongCash For Work (CFW) ProgramTree PlantingFinished
LeyteMayorgaPob. Zone 3Cash For Work (CFW) ProgramDesilting of Existing Canal & Stablishment of Extension Earth Canal (Drainage Canal)Finished
LeyteMayorgaPob. Zone 4Cash For Work (CFW) ProgramEstablishment of Earth Canal in SchoolFinished
LeyteMayorgaPob. Zone 5Cash For Work (CFW) ProgramDerooting of Tree Trunks & Land Beautificationin schoolFinished
LeyteMayorgaPob. Zone 6Cash For Work (CFW) ProgramPainting Works (Ceiling of 10-Classroom)Finished
LeyteTanauanBisligCash For Work (CFW) ProgramRepair of pathway Finished
LeyteTanauanBisligCash For Work (CFW) ProgramEstablishment of compost pit (5zones) Finished
LeyteTanauanBisligCash For Work (CFW) ProgramBackfilling ( brgy. Selected site) Finished
LeyteTanauanBisligCash For Work (CFW) ProgramEstablishment of compost pit in school Finished
LeyteTanauanBisligCash For Work (CFW) ProgramRehabilitation of school garden Finished
LeyteTanauanBisligCash For Work (CFW) ProgramEstablishment of communal garden (5zones) Finished



Unconditional Cash Transfer Program of Plan International funded 100% by ADB JFPR Grant 9175:
ProvinceTown/CityBarangayInterventionDetailsStatus
ESamarBalangkayanBalogoUnconditional Cash Transfers14 beneficiaries (5 males, 9 females)Finished
ESamarBalangkayanCabayUnconditional Cash Transfers32 beneficiaries (11 males, 21 females)Finished
ESamarBalangkayanGuinpoliranUnconditional Cash Transfers24 beneficiaries (3 males, 11 females)Finished
ESamarBalangigaCansumangkayUnconditional Cash Transfers20 beneficiaries (7 males, 13 females)Finished
ESamarBalangigaCag-olangoUnconditional Cash Transfers10 beneficiaries (5 males, 5 females)Finished
ESamarBalangigaSan MiguelUnconditional Cash Transfers29 beneficiaries (14 males, 15 females)Finished
ESamarBalangigaSta. RosaUnconditional Cash Transfers30 beneficiaries (13 males, 17 females)Finished
ESamarGuiuanCogonUnconditional Cash Transfers27 beneficiaries (12 males, 15 females)Finished
ESamarGuiuanInapulanganUnconditional Cash Transfers12 beneficiaries (6 males, 6 females)Finished
ESamarGuiuanSuluanUnconditional Cash Transfers29 beneficiaries (18 males, 11 females)Finished
ESamarHernaniGarawonUnconditional Cash Transfers21 beneficiaries (10 males, 11 females)Finished
ESamarHernaniSan IsidroUnconditional Cash Transfers11 beneficiaries (6 males, 5 females)Finished
WSamarBaseyBacubacUnconditional Cash Transfers15 beneficiaries (8 males, 7 females)Finished
WSamarBaseyCatadmanUnconditional Cash Transfers20 beneficiaries (12 males, 8 females)Finished
WSamarBaseyOld San AgustinUnconditional Cash Transfers25 beneficiaries (11 males, 14 females)Finished
LeyteBurauenBuriUnconditional Cash Transfers21 beneficiaries (8 males, 13 females)Finished
LeyteBurauenCalsadahayUnconditional Cash Transfers11 beneficiaries (3 males, 8 females)Finished
LeyteBurauenPatongUnconditional Cash Transfers7 beneficiaries (4 males, 3 females)Finished
LeyteBurauenHapunanUnconditional Cash Transfers19 beneficiaries (8 males, 11 females)Finished
LeyteBurauenSan PabloUnconditional Cash Transfers30 beneficiaries (16 males, 14 females)Finished
LeyteBurauenVilla AuroraUnconditional Cash Transfers19 beneficiaries (11 males, 8 females)Finished
LeyteDulagSalvacionUnconditional Cash Transfers17 beneficiaries (6 males, 11 females)Finished
LeyteKanangaAguitingUnconditional Cash Transfers22 beneficiaries (7 males, 14 females)Finished
LeyteKanangaCacaoUnconditional Cash Transfers22 beneficiaries (12 males, 10 females)Finished
LeyteKanangaMontebelloUnconditional Cash Transfers27 beneficiaries (6 males, 21 females)Finished
LeyteKanangaTagaytayUnconditional Cash Transfers22 beneficiaries (6 males, 16 females)Finished
LeyteKanangaTugbongUnconditional Cash Transfers21 beneficiaries (7 males, 14 females)Finished
LeyteMayorgaPob. Zone 3Unconditional Cash Transfers20 beneficiaries (7 males, 13 females)Finished
LeyteTanauanBisligUnconditional Cash Transfers23 beneficiaries (8 males, 15 females)Finished



School Maintenance and WASH Orientation Program conducted by Plan International funded 100% by ADB JFPR Grant 9175:
ProvinceTown/CityBarangayDetailsStatus
ESamarBalangigaCag-olangoCag-olango Elementary SchoolFinished
ESamarBalangigaCansumangkayCansumangkay Elementary SchoolFinished
ESamarBalangigaSan MiguelSan Miguel Elementary SchoolFinished
ESamarBalangigaSta. RosaSta. Rosa Elementary SchoolFinished
ESamarBalangkayanBalogoBalogo Elementary SchoolFinished
ESamarBalangkayanCabayCabay Elementary SchoolFinished
ESamarBalangkayanGuinpoliranGuinpoliran Elementary SchoolFinished
ESamarGuiuanCogonGuiuan National High SchoolFinished
ESamarGuiuanInapulanganInapulangan Elementary School 
ESamarGuiuanSuluanSuluan Integrated School 
ESamarHernaniGarawonGarawon Elementary SchoolFinished
ESamarHernaniSan IsidroSan Isidro Elementary SchoolFinished
ESamarQuinapondanPoblacionQuinapondan Central SchoolFinished
ESamarSalcedoBrgy 2Salcedo National High School 
LeyteBurauenBuriBuri Elementary SchoolFinished
LeyteBurauenCalsadahayCalsadahay Elementary SchoolFinished
LeyteBurauenHapunanHapunan Elementary SchoolFinished
LeyteBurauenPatongPatong Elementary SchoolFinished
LeyteBurauenSan PabloSan Pablo Elementary SchoolFinished
LeyteBurauenVilla AuroraVilla Aurora Elementary SchoolFinished
LeyteDulagSalvacionSalvacion Elementary SchoolFinished
LeyteKanangaAguitingAguiting Elementary SchoolFinished
LeyteKanangaCacaoCacao Elementary SchoolFinished
LeyteKanangaKanangaKananga National High SchoolFinished
LeyteKanangaTagaytayTagaytay Elementary SchoolFinished
LeyteKanangaTugbongTugbong Elementary SchoolFinished
LeyteMayorgaPoblacionMayorga Central Elementary SchoolFinished
LeyteTanauanBisligBislig Elementary SchoolFinished
WSamarBaseyBacubacBacubac Elementary SchoolFinished
WSamarBaseyCatadmanCatadman Elementary SchoolFinished
WSamarBaseyOld San AgustinOld San Agustin Elementary SchoolFinished



Youth Skills Training by Plan International funded 100% by ADB JFPR Grant 9175:
ProvinceTown/CityBarangayInterventionDetailsStatus
ESamarBalangkayanBalogoTVET / TESDA Certified Course17 beneficiaries (15 males, 2 females)Finished
ESamarBalangkayanCabayTVET / TESDA Certified Course7 beneficiaries (2 males, 5 females)Finished
ESamarBalangkayanGuinpoliranTVET / TESDA Certified Course5 beneficiaries (3 males, 2 females)Finished
ESamarBalangigaCansumangkayTVET / TESDA Certified Course8 beneficiaries (8 males)Finished
ESamarBalangigaCag-olangoTVET / TESDA Certified Course2 beneficiaries (1 male, 1 female)Finished
ESamarBalangigaSan MiguelTVET / TESDA Certified Course10 beneficiaries (5 males, 5 females)Finished
ESamarBalangigaSta. RosaTVET / TESDA Certified Course2 beneficiaries (2 females)Finished
ESamarGuiuanCogonTVET / TESDA Certified Course3 beneficiaries (3 males)Finished
ESamarGuiuanInapulanganTVET / TESDA Certified Course11 beneficiaries (9 males, 2 females)Finished
ESamarGuiuanSuluanTVET / TESDA Certified Course3 beneficiaries (3 males)Finished
ESamarHernaniGarawonTVET / TESDA Certified Course13 beneficiaries (7 males, 6 females)Finished
ESamarHernaniSan IsidroTVET / TESDA Certified Course5 beneficiaries (3 males, 2 females)Finished
WSamarBaseyBacubacTVET / TESDA Certified Course6 beneficiaries (4 males, 2 females)Finished
WSamarBaseyCatadmanTVET / TESDA Certified Course8 beneficiaries (7 males, 1 female)Finished
WSamarBaseyOld San AgustinTVET / TESDA Certified Course11 beneficiaries (7 males, 4 females)Finished
LeyteBurauenBuriTVET / TESDA Certified Course7 beneficiaries (5 males, 2 females)Finished
LeyteBurauenCalsadahayTVET / TESDA Certified Course6 beneficiaries (4 males, 2 females)Finished
LeyteBurauenPatongTVET / TESDA Certified Course6 beneficiaries (3 males, 3 females)Finished
LeyteBurauenHapunanTVET / TESDA Certified Course3 beneficiaries (1 male, 3 females)Finished
LeyteBurauenSan PabloTVET / TESDA Certified Course6 beneficiaries (4 males, 2 females)Finished
LeyteBurauenVilla AuroraTVET / TESDA Certified Course13 beneficiaries (6 males, 7 females)Finished
LeyteDulagSalvacionTVET / TESDA Certified Course12 beneficiaries (7 males, 5 females)Finished
LeyteKanangaAguitingTVET / TESDA Certified Course16 beneficiaries (7 males, 9 females)Finished
LeyteKanangaCacaoTVET / TESDA Certified Course4 beneficiaries (3 males, 1 female)Finished
LeyteKanangaTagaytayTVET / TESDA Certified Course2 beneficiaries (1 male, 1 female)Finished
LeyteKanangaTugbongTVET / TESDA Certified Course6 beneficiaries (3 males, 3 females)Finished
LeyteMayorgaPob. Zone 3TVET / TESDA Certified Course4 beneficiaries (3 males, 1 female)Finished
LeyteTanauanBisligTVET / TESDA Certified Course5 beneficiaries (5 males)Finished



List of other interventions funded by ADB JFPR Grant 9175 to follow soon.
Please revisit this page from time to time as the lists are frequently updated.